Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 32-Broad-Carpenter to Ridge-Lyceum at Cecil B Moore Av on 33rd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 - 7 Mins
at . 1:57 behind Vehicle 8244 Load 116%? Broad-Carpenter

2: 15 - 21 Mins
at . 0:17 behind Vehicle 8250 Load 79%? Broad-Carpenter

3: 27 - 30 Mins
at . 1:57 ahead of Vehicle 8629 Load 71%? Broad-Carpenter In long layover, last seen 2:47

4: 42 - 46 Mins
at . 1:55 behind Vehicle 3241 Load 104%? Broad-Carpenter

5: 1h17 - 1h22 Mins
at . 0:21 ahead of Vehicle 3323 Load 228%? Broad-Carpenter

Construction Started May 13 Until May 18
7:00pm to 5:00am on 5-13-, 24 to 5-18-24, SB via Logan Square, Right on Ben Franklin Parkway, Right on 17th Street, Left on Market St., Reg. rt.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.