Current time: Refresh

Agencies » Boise VRT

Route 9 Started Mon May 12 Until Wed Oct 1
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Route 7 and 8 - stop closure Started Thu Jun 19 Until Sat Aug 30
Outbound stop on Main and 23rd is closed and no temp stop placed due to construction in the area.

Remove ads by becoming a Premium User

 • : 7-Fairview at W Cascade Dr NEC on N Cole Rd

| Prev Stop | Next Stop | Schedule | Set Destination

1: 12 Mins
at . 0:00 behind Vehicle 801 Load 88%? 06:15:00-16 Towards Main Street Station

2: 28 Mins
at . 0:00 behind Vehicle 4004 Load 104%? 06:30:00-16 Towards Main Street Station

3: 43 Mins
at . 0:00 behind Vehicle 812 Load 98%? 06:45:00-16 Towards Main Street Station

4: 58 Mins
at . 0:00 behind Vehicle 4002 Load 98%? 07:00:00-16 Towards Main Street Station

5: 1h13 Mins
at . 0:00 behind Vehicle 802 Load 98%? 07:15:00-16 Towards Main Street Station

MSS Closure Started Mon Jun 9 Until Mon Sep 1
All buses that normally use Main Street Station downstairs are relocated upstairs. Visit ridevrt.org/MSS25 for more information.
Route 7 and 8 - stop closure Started Fri Jun 27 Until Thu Jul 31
Outbound stop closed on Main and 27th due to construction and temp stop placed far-side of the intersection, right after the entrance to the Gas station.

Add stop (different agency)