Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 22-Knight/Downtown at E 47 Ave on Southbound Knight St going 22 Knight

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 - 16 Mins
at . 0:09 ahead of Vehicle 18370 Load 89%? Last seen 1:55

Stop 58099 Burrard Station @ Bay 5 is temporarily closed from Tue May 14 through Sun May 26 due to construction. Started May 14 Until May 27
Stop 51298 Southbound Knight St @ E 27 Ave is temporarily closed from Fri May 17 through Sat May 18 due to construction. Starts Until May 19
Affected routes:
022

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.