Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : SCO-South Coast Line at Bellambi Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 24 - 28 Mins
at . 0:10 behind Vehicle 3753.6376.4451.9191.4008.9751.2388.7101 Load 880%? Platform 2 Kiama

2: 33 Mins
at . 0:00 behind Vehicle 8901.9607.1636.9330 Load 135%? Platform 2 Port Kembla Last seen 1:55

3: 33 Mins
at . 0:00 behind Vehicle 6881 Load 0%? Platform 2 Port Kembla In long layover, last seen 1:02:09

4: 1h13 - 1h16 Mins
at . 3:06 ahead of Vehicle 5843.2160.7376.5975.3307.3798.5569.2271 Load 584%? Platform 2 Kiama

5: 1h24 Mins
at . 0:00 behind Vehicle 5645 Load 144%? Platform 2 Port Kembla In long layover, last seen 11:49

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.