Current time: Refresh

Agencies » Boston MBTA

Silver Line - SL3 is experiencing delays of up to 25 minutes due to traffic Started Until

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Airport

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 Mins
at . 6:45 behind Vehicle 1326 Load 191%? South Station

2: 16 Mins
at . 20:08 behind Vehicle 1306 Load 12%? South Station

3: 21 Mins
at . 2:41 behind Vehicle 1304 Load 48%? South Station

4: 34 Mins
at . 4:28 behind Vehicle 1312 Load 111%? South Station

5: 56 Mins
at . 2:17 behind Vehicle 1325 Load 190%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.