Current time: 9:15:26PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 6 will be detoured.
Route 6 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Friday, May 17 at 8 a.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 8 Street S.W. @ 7 Avenue S.W. for LRT track work. Route 6 will be detoured.
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 6-Killarney/26 Av SW at 16A ST SW on WB 17 AV SW going ←Westhills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 - 10 Mins at 9:22:41PM. 4:16 behind 9:20:00PM Vehicle 8139 Load 104%?
2: 34 - 45 Mins at 9:49:26PM. 2:34 behind 9:50:00PM Vehicle 8056 Load 94%? ↩
3: 1h03 - 1h11 Mins at 10:19:24PM. 2:47 behind 10:20:00PM Vehicle 8247 Load 101%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Starting Friday, May 10 at 7 a.m. through Tuesday, May 21 at 7 p.m., northbound lanes on 8 Street between 6 - 7 Avenue S.W. will be closed for construction.
Stop #5122 located on 8 Street @ 7 Avenue S.W. (nearside) will be temporarily closed. Please use the temporary stop located just across 7 Avenue S.W., ahead of the closed stop. Started May 10 7:00AM Until May 21 7:00PM
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.