Current time: 3:32:35PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at Bermuda RD NW on WB Beddington BV going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 4 - 5 Mins at 3:36:49PM. 8:33 behind 3:29:00PM Vehicle 8219 Load 124%?
2: 33 - 41 Mins at 4:06:09PM. 19:35 behind 3:49:00PM Vehicle 8253 Load 164%?
3: 35 - 44 Mins at 4:07:57PM. 2:30 behind 4:09:00PM Vehicle 8108 Load 24%?
4: 57 - 1h11 Mins at 4:30:07PM. 6:10 behind 4:29:00PM Vehicle 8053 Load 118%? ↩
5: 1h17 - 1h29 Mins at 4:50:27PM. 5:51 behind 4:49:00PM Vehicle 8059 Load 98%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.