Current time: 4:32:22PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 19 AV N on NB Centre ST N going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 27 - 35 Mins at 4:59:39PM. 11:25 behind 4:51:00PM Vehicle 8080 Load 157%?
2: 43 - 53 Mins at 5:16:04PM. 8:12 behind 5:11:00PM Vehicle 8069 Load 84%? ↩
3: 59 - 1h12 Mins at 5:32:02PM. 5:51 behind 5:31:00PM Vehicle 8219 Load 88%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.