Current time: Refresh

Agencies » AC Transit

Jackson at Ohlone Stop Closed Started Aug 31 2022 Until Aug 1

Remove ads by becoming a Premium User

 • : 18-Solano - Shattuck - MLK Jr. at San Pablo Av on Thomas L Berkley Way (20th St)

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:07 Mins
at . 2:09 behind Vehicle 1356 Load 77%? Empty Lake Merritt Bart

2: 17 Mins
at . 3:28 behind Vehicle 7038 Load 85%? Empty Lake Merritt Bart

3: 26 Mins
at . 1:49 ahead of Vehicle 7033 Load 91%? Empty Lake Merritt Bart

4: 40 Mins
at . 3:26 ahead of Vehicle 1559 Load 275%? Empty Lake Merritt Bart

5: 1h15 Mins
at . 0:00 behind Vehicle 1587 Load 221%? Lake Merritt Bart

Review Realign Draft Plan Started May 15 Until Jun 5
Review Realign Draft Plan
actransit.org/realign
Shattuck/University Stop Closed Started Apr 17 Until Jun 3
On-Board Survey Started Sep 21 2023 Until May 23
On-Board Survey
9/2023 - 5/2024
Sunday Schedules on Memorial Day Starts May 20 Until May 28

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.