Current time: Refresh

Agencies » Boise VRT

Route 9 Started Mon May 12 Until Wed Oct 1
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Route 7 and 8 - stop closure Started Thu Jun 19 Until Sat Aug 30
Outbound stop on Main and 23rd is closed and no temp stop placed due to construction in the area.

Remove ads by becoming a Premium User

 • : 7-Fairview at Main Street Station - Upper Deck
Destination: W Cascade Dr NEC on N Cole Rd

2: 16 Mins
at . 2:25 behind Vehicle 4004 Load 51%? 19:00:00-16 Towards Main Street Station
Destination in 1:33 at .
3: 29 Mins
at . 0:00 behind Vehicle 802 Load 86%? 19:15:00-16 Towards Main Street Station
Destination in 14 at .
4: 59 Mins
at . 0:00 behind Vehicle 812 Load 206%? 19:45:00-16 Towards Main Street Station
Destination in 44 at .
5: 1h29 Mins
at . 0:00 behind Vehicle 802 Load 205%? 20:15:00-16 Towards Main Street Station
Destination in 1h14 at .
MSS Closure Started Mon Jun 9 Until Mon Sep 1
All buses that normally use Main Street Station downstairs are relocated upstairs. Visit ridevrt.org/MSS25 for more information.
Route 7 and 8 - stop closure Started Fri Jun 27 Until Thu Jul 31
Outbound stop closed on Main and 27th due to construction and temp stop placed far-side of the intersection, right after the entrance to the Gas station.
Route 7 and route 8 Started Tue Jul 15 Until Thu Jul 31
Out bound stop at Idaho and 15th closed. No temp placed

Add stop (different agency)