Agencies » Boston MBTA

 •  Red Line

 
Stops
 
Red Line: Delays of up to 25 minutes due to an ongoing signal problem at Central. Trains are being asked to stand by at stations. Started Until

Jump to: North

Ashmont
Alewife
Davis
Porter
Harvard
Central
Kendall/MIT
Charles/MGH
Park Street
Downtown Crossing
South Station
Broadway
Andrew
JFK/UMass
Savin Hill
Fields Corner
Shawmut
Ashmont
Braintree
Alewife
Davis
Porter
Harvard
Central
Kendall/MIT
Charles/MGH
Park Street
Downtown Crossing
South Station
Broadway
Andrew
JFK/UMass
North Quincy
Wollaston
Quincy Center
Quincy Adams
Braintree
Alewife
Braintree
Quincy Adams
Quincy Center
Wollaston
North Quincy
JFK/UMass
Andrew
Broadway
South Station
Downtown Crossing
Park Street
Charles/MGH
Kendall/MIT
Central
Harvard
Porter
Davis
Alewife
Alewife
Ashmont
Shawmut
Fields Corner
Savin Hill
JFK/UMass
Andrew
Broadway
South Station
Downtown Crossing
Park Street
Charles/MGH
Kendall/MIT
Central
Harvard
Porter
Davis
Alewife
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Red Line riders can expect longer travel times on the Braintree Branch nightly from 8 PM, to end of service. This is to allow for critical signal work near JFK/UMass. Starts Sat Mar 14 Until Sun Mar 15
How Long Will the Work Take:
To accomplish this work, four phases of temporary evening service changes will continue through April. Each phase should take about two weeks to complete.

How Much Longer Will my Trip Be:
Riders should budget an additional 10 – 15 minutes of travel time during this work.

When is the Next Phase:
Likely beginning March 15 with longer travel times on the Ashmont Branch.

Why are we Doing This:
This work is part of a signal modernization project in Columbia Junction near JFK/UMass. Signals in this area were significantly damaged by a derailment in 2019.
Special St. Patrick's Day shuttle bus service will be available to and from South Station and South Boston from 9:30 AM to 5 PM on Sunday, March 15. Starts Sun Mar 15 Until Sun Mar 15
The last trip back to South Station will leave at 4:30 PM:

Shuttles to South Boston:
Pick up at Summer St @ Atlantic Ave
Drop off at E 1st St @ City Point Bus Terminal.

Shuttles to South Station:
Pick up at E 1st St @ City Point Bus Terminal
Drop off at Summer St @ Atlantic Ave.