Agencies » Halifax Transit
• 8-Sackville Corridor
Jump to: ↓South
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stop Closure Notice:
Route: 8 Sackville Corridor Inbound
Location: Robie St Before Cedar St (8196)
Cause: Stop Closed Construction
Affected Stops:
Robie St Before Cedar St (8196)
Stop Closure for Stops Robie St After Veterans Memorial Ln (8179)
Stop Closure for Stops Robie St Before Quinpool Rd (8223)
Stop Closure for Stops Robie St After Jubilee Rd (8195)
Stop Closure for Stops Sackville Dr Before Oakdale Dr (7323) --> SACKVILLE DR & OAKDALE DR
Detour Notice:
Route: 8 Sackville Corridor Outbound
Location: Sackville Dr Before Riverside Dr (7329)
Cause: Snow Plan
Affected Stops: Downsview Dr Before Old Sackville Rd (8432)
Downsview Dr Before Touchstone Ct (9001)
Downsview Plaza After Sackville Dr (8433)
Detouring Routing:
SACKVILLE DR (NW)
L-BEAVER BANK CONN
L-OLD SACKVILLE RD
R-WALKER AVE
No Service to Downsview
Detour Notice
Routes: 8 Sackville Corridor Outbound
Date Effective: Immediate
Location: Barrington St Before Spring Garden Rd (6122)
Cause: Snow Plan
Affected Stops: Spring Garden Rd Before Dresden Row (8330)
Spring Garden Rd Before Queen St (8331)
Spring Garden Rd Before South Park St (8334)
Detouring Routing:
CONTINUE ON BARRINGTON ST
R-MORRIS ST
R-SOUTH PARK ST
L-SPRING GDN RD TO ROUTE
Detour Notice:
Route: 8 Sackville Corridor Inbound
Location: Sackville Terminal Bay 5 (8961)
Cause: Snow Plan
Affected Stops: Downsview Dr After Quinella Ct (8431)
Downsview Dr After Touchstone Ct (9000)
Downsview Plaza Before Sackville Dr (6579)
Detouring Routing:
WALKER AVE (NE)
L-OLD SACKVILLE RD
R-BEAVER BANK CONN
R-SACKVILLE DR
No Service to Downsview