Current time: Refresh
• M1-Norristown High Speed Line Local Vehicle Location Map
Remove ads by becoming a Premium User
Bus service replaces train service from Norristown Transit Center to Bridgeport Station from August 1 through August 21. Passengers should allow an additional 15 minutes for travel. For details and schedules, visit SEPTA.org. Shuttle bus information is available on a separate Shuttle Bus schedule page.
Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen
Vehicle 131 0:05 ahead of going ↑Bridgeport
past 69th St Transit Center Last seen 1:06
Vehicle 132 51:22 behind going ↑Bridgeport
past 69th St Transit Center Last seen 39:08
Vehicle 139 1:52 behind going ↓69th St Transit Center
past Radnor South Last seen 1:04
Vehicle 143 4:22 behind going ↑Bridgeport
past Gulph Mills Last seen 5:28
Vehicle 152 1:31 ahead of going ↓69th St Transit Center
at Bridgeport Last seen 42:33
The Norristown High Speed Line is now the “M” as part of system-wide wayfinding improvements. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.
Bus service replaces train service from Norristown Transit Center to Gulph Mills Station from August 22 through August 30. Passengers should allow an additional 15 minutes for travel. For details and schedules, visit SEPTA.org.
Bus service replaces train service from Norristown Transit Center to Bridgeport Station from August 31 through December 19. Passengers should allow an additional 15 minutes for travel. For details and schedules, visit SEPTA.org. Shuttle bus information is available on a separate Shuttle Bus schedule page.