Current time: Refresh
Agencies » Philadelphia SEPTA
• M1-Norristown High Speed Line Local
Remove ads by becoming a Premium User
To support a major rehabilitation project on the Bridgeport Viaduct, bus service replaces train service from Bridgeport Station to Norristown Transit Center until Saturday, May 9. Passengers should plan for an increase in travel time. For project details and schedules, visit septa.org. Shuttle bus information is available on a separate M1 Shuttle Bus schedule page.
Vehicle 154 3:42 behind going ↑Bridgeport
past Radnor South
Vehicle 141 0:04 ahead of going ↑Bridgeport
past 69th St Transit Center
Vehicle 152 0:30 ahead of going ↑Bridgeport
past DeKalb St In long layover, last seen 17:00
Vehicle 146 17:15 behind going ↓69th St Transit Center
aprchg Township Line Rd
Missing vehicles
Scheduled to be at Beechwood-Brookline going to ↓69th St Transit Center.
The Norristown High Speed Line is now the “M” as part of system-wide wayfinding improvements. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.