Current time: Refresh

Agencies » Philadelphia SEPTA

 •  M1-Norristown High Speed Line Local

 
Vehicles
 

Remove ads by becoming a Premium User

Shuttle Busing Between Bridgeport Station and Norristown Transit Center Started Sun Mar 29 Until Sat May 9
To support a major rehabilitation project on the Bridgeport Viaduct, bus service replaces train service from Bridgeport Station to Norristown Transit Center until Saturday, May 9. Passengers should plan for an increase in travel time. For project details and schedules, visit septa.org. Shuttle bus information is available on a separate M1 Shuttle Bus schedule page.

Vehicle 152 0:36 behind going Bridgeport
past 69th St Transit Center Last seen 1:10

Vehicle 143 2:00 behind going Bridgeport
aprchg DeKalb St In long layover, last seen 4:30

Vehicle 131 0:15 behind going 69th St Transit Center
at County Line Last seen 1:09

Leaflet | Map data © OpenStreetMap contributors

The scheduled single track operation for today is canceled. Passengers may board trains from their regular platform locations between Township Line Road and Beechwood-Brookline Stations. Started Until
The scheduled single track operation for today is canceled. Passengers may board trains from their regular platform locations between Township Line Road and Beechwood-Brookline Stations.
Norristown High Speed Line is Now the “M” Started Thu Dec 12 2024
The Norristown High Speed Line is now the “M” as part of system-wide wayfinding improvements. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.