Current time: Refresh
Agencies » Philadelphia SEPTA
• M1-Norristown High Speed Line Local
Remove ads by becoming a Premium User
To support a major rehabilitation project on the Bridgeport Viaduct, bus service replaces train service from Bridgeport Station to Norristown Transit Center until Saturday, May 9. Passengers should plan for an increase in travel time. For project details and schedules, visit septa.org. Shuttle bus information is available on a separate M1 Shuttle Bus schedule page.
Vehicle 136 4:04 behind going ↑Bridgeport
at Beechwood-Brookline
Vehicle 151 2:46 behind going ↑Bridgeport
past Hughes Park In long layover, last seen 54:19
Vehicle 131 2:27 behind going ↑Bridgeport
past Hughes Park In long layover, last seen 24:24
Vehicle 154 0:29 behind going ↓69th St Transit Center
past Radnor South
Vehicle 150 1:39 behind going ↓69th St Transit Center
aprchg Parkview In long layover, last seen 1:02:13
Vehicle 152 2:53 behind going ↓69th St Transit Center
aprchg Parkview In long layover, last seen 45:44
Vehicle 132 3:50 ahead of going ↓69th St Transit Center
aprchg 69th St Transit Center In long layover, last seen 18:42
Missing vehicles
Scheduled to be at 69th St Transit Center going to ↓69th St Transit Center.
The Norristown High Speed Line is now the “M” as part of system-wide wayfinding improvements. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.