Current time: Refresh

Agencies » Philadelphia SEPTA

 •  37-Chester Transit Ctr to Broad-Snyder

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 3580 1:29 behind going Broad-Snyder via Airport Empty
aprchg Philadelphia Airport Terminal A

Vehicle 3583 4:08 ahead of going Pnc Operations Center via Eastwick Industrial Park
aprchg 89th St on Tinicum Blvd In long layover, last seen 18:49

Vehicle 8442 3:21 ahead of going Chester Transit Center
aprchg Chester Transit Center In long layover, last seen 9:47

Vehicle 8510 3:21 behind going Broad-Snyder via Airport
at 15th St on Passyunk Av In long layover, last seen 24:52

Leaflet | Map data © OpenStreetMap contributors

PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, WB via Bartram, L – Tinicum Blvd, L – 89th St,, R – Driveway to PNC Bus, Shelter at 88th, L – 88th St, L –, Bartram, Reg Rt
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, EB via Bartram, Right on 89th St,, R – Driveway to PNC Bus, Shelter at 88th, L – 88th St, R, – Tinicum Blvd, R – Bartram, Reg RT
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, EB via PNC Bus Shelter at, 88th, L – 88th St,, R – Tinicum Blvd, R –, Bartram, Reg Rt,, PNC Trips (Weekends, Only)
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, WB via Bartram L – Tinicum, Blvd, L – 89th St, R –, Driveway to PNC Bus, Shelter at 88th, Take, Recovery.,, PNC Trips Weekends Only