Current time: Refresh

Agencies » Boston MBTA

 •  Framingham/Worcester Line

 
Vehicles
 

Remove ads by becoming a Premium User

Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville today. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville

Vehicle 1835 0:22 behind going 503 Worcester
aprchg Wellesley Farms

Vehicle 1863 2:13 behind going 506 South Station
aprchg Grafton

Missing vehicles

Scheduled to be at Wellesley Hills going to 502 South Station.

Leaflet | Map data © OpenStreetMap contributors

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. Started Mon Jan 24 2022
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.