Current time: Refresh
Agencies » Halifax Transit
• 8-Sackville Corridor
Remove ads by becoming a Premium User
Vehicle 1210 0:20 behind going ↑8 Sackville Terminal Many Seats Load: 20%
past Flamingo Dr on Bedford Hwy
Vehicle 1156 2:12 ahead of going ↑8 Sackville Terminal Many Seats Load: 20%
past Russell St on Robie St
Vehicle 1346 3:57 ahead of going ↑8 Sackville Terminal
aprchg Duke St Bay 5 on Barrington St
Vehicle 1235 0:09 behind going ↑8 Sackville Terminal Many Seats
past Rocky Lake Dr on Bedford Hwy
Vehicle 1202 3:10 behind going ↓8 Downtown Via Spring Garden Many Seats Load: 40%
past Kearney Lake Rd on Bedford Hwy
Vehicle 1171 0:08 behind going ↓8 Downtown Via Spring Garden Many Seats Load: 40%
past Almon St on Robie St
Vehicle 1278 5:43 ahead of going ↓8 Downtown Via Spring Garden
at Sackville Terminal Bay 5
Vehicle 1413 1:15 ahead of going ↓8 Downtown Via Spring Garden Many Seats
aprchg Oakmount Dr on Bedford Hwy
Missing vehicles
Scheduled to be at Cogswell St Bay 2 on Barrington St going to ↓8 Downtown Via Spring Garden. Currently on route 29.
Stop Closure for Stops Robie St After Jubilee Rd (8195)
Stop Closure for Stops Sackville Dr Before Oakdale Dr (7323) --> SACKVILLE DR & OAKDALE DR
Stop Closure Notice:
Route: 8 Sackville Corridor Inbound
Location: Robie St Before Cedar St (8196)
Cause: Stop Closed Construction
Affected Stops:
Robie St Before Cedar St (8196)
Stop Closure Notice
Date Effective: Immediate
Stop Location: Robie St After Pepperell St (8183)
Routes affected: 8, 4, 7B, 90
Direction: Inbound
Cause: Construction
Stop Closure for Stops Robie St After Veterans Memorial Ln (8179)
Stop Closure for Stops Robie St Before Quinpool Rd (8223)