Current time: Refresh
Agencies » Halifax Transit
• 8-Sackville Corridor
Remove ads by becoming a Premium User
Vehicle 1191 0:25 ahead of going ↑8 Sackville Terminal Many Seats Load: 20%
aprchg Cresthaven Dr on Bedford Hwy
Vehicle 1266 0:14 behind going ↑8 Sackville Terminal Many Seats
aprchg Blowers St on Barrington St
Vehicle 2001 0:08 behind going ↑8 Sackville Terminal Many Seats Load: 20%
at Touchstone Ct on Downsview Dr
Vehicle 1289 2:11 behind going ↓8 Downtown Via Spring Garden Many Seats Load: 20%
aprchg Larry Uteck Blvd on Bedford Hwy
Vehicle 1267 6:31 behind going ↓8 Downtown Via Spring Garden Many Seats Load: 20%
at Cunard St on Robie St
Vehicle 1229 Waiting 26:29. 3:17 ahead of going ↓8 Downtown Via Spring Garden
past Sackville Terminal Bay 5
Stop Closure for Stops First Lake Dr After Cavendish Dr (6687) --> 275 First Lake Dr.
Stop Closure for Stops Robie St After Jubilee Rd (8195)
Stop Closure for Stops Sackville Dr Before Oakdale Dr (7323) --> SACKVILLE DR & OAKDALE DR
Stop Closure Notice:
Route: 8 Sackville Corridor Inbound
Location: Robie St Before Cedar St (8196)
Cause: Stop Closed Construction
Affected Stops:
Robie St Before Cedar St (8196)
Stop Closure Notice
Date Effective: Immediate
Stop Location: Robie St After Pepperell St (8183)
Routes affected: 8, 4, 7B, 90
Direction: Inbound
Cause: Construction
Stop Closure for Stops Robie St After Veterans Memorial Ln (8179)
Stop Closure for Stops Robie St Before Quinpool Rd (8223)