Current time: Refresh
Agencies » Manchester Bee Network
• 216-Manchester - Clayton - Droylsden - Ashton
Remove ads by becoming a Premium User
Vehicle BD74WHL 4:52 behind going →Ashton-under-Lyne Interchange
at Schofield Street on Ashton New Road
Vehicle BU25YWL 16:33 behind going →Ashton-under-Lyne Interchange
past Schofield Street on Ashton New Road
Vehicle BD74WKE Waiting 46:08. 23:40 behind going →Ashton-under-Lyne Interchange
aprchg Ashton-under-Lyne Interchange on Water Street Last seen 46:08
Vehicle BD74WKM Waiting 1:15:16. 34:19 behind going ←Piccadilly Gardens
aprchg Piccadilly Gardens on Piccadilly Last seen 1:15:16
Vehicle BD74WHH 4:50 behind going ←Piccadilly Gardens
aprchg Jersey Street on Great Ancoats Street
Vehicle BU25YWR 21:26 behind going ←Piccadilly Gardens
past Holt Town Metrolink Stop on Ashton New Road
Vehicle BD74WJM 1:19 ahead of going ←Piccadilly Gardens
past Hillkirk Street on Ashton New Road
Vehicle BU25_YVV 0:05 behind going ←Piccadilly Gardens
aprchg Droylsden Metrolink Stop on Ashton Road
Vehicle BU25YVK 1:00 behind going ←Piccadilly Gardens
aprchg Cavendish Street on Katherine Street
Missing vehicles
Scheduled to be at Etihad Stadium on Ashton New Road going to →Ashton-under-Lyne Interchange.
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
A one-way closure is in place on Armentieres Square and Trinity Street, whilst Market street is closed in both directions. During this time, bus services are on diversion.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.