Current time: Refresh
Agencies » Manchester Bee Network
• 216-Manchester - Clayton - Droylsden - Ashton
Remove ads by becoming a Premium User
Vehicle BD74WJM 44:23 ahead of going →Ashton-under-Lyne Interchange
past Faraday Street on Lever Street
Vehicle BD74WHM 1:00:15 ahead of going →Ashton-under-Lyne Interchange
aprchg Hawthorne Grove on Manchester Road
Vehicle BU25YWM 28:56 ahead of going →Ashton-under-Lyne Interchange
at Cavendish Street on Katherine Street
Vehicle BD74WKF 53:03 ahead of going →Ashton-under-Lyne Interchange
past Cavendish Street on Katherine Street
Vehicle BU25YVO Waiting 17:06. 58:58 ahead of going →Ashton-under-Lyne Interchange
aprchg Ashton-under-Lyne Interchange on Water Street Last seen 16:53
Vehicle BD74WJY 45:11 behind going →Ashton-under-Lyne Interchange
aprchg Katherine Street on Gas Street Last seen 1:09:39
Vehicle BD74WKH Waiting 37:24. going ←Piccadilly Gardens
at The Manchester College on Hyde Road Last seen 37:24
Vehicle BU25YWR 46:52 ahead of going ←Piccadilly Gardens
aprchg Jersey Street on Great Ancoats Street
Vehicle BD74WKG 53:18 ahead of going ←Piccadilly Gardens
past Hillkirk Street on Ashton New Road
Vehicle BU25YWJ 59:01 ahead of going ←Piccadilly Gardens
at Snipe Way on Manchester Road
Missing vehicles
Scheduled to be at Warwick Street on Oldham Street going to ←Piccadilly Gardens.
Scheduled to be at Edge Lane Metrolink Stop on Manchester Road going to →Ashton-under-Lyne Interchange.
From Monday 19 January, there will be no access to the single-story park and ride, whilst works take place.
A one-way closure is in place on Armentieres Square and Trinity Street, whilst Market street is closed in both directions. During this time, bus services are on diversion.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
Due to congestion and roadworks around Greater Manchester, some services are experiencing a delay.