Current time: Refresh

Agencies » Manchester Bee Network

 •  368-Wythenshawe - Stockport

 
Vehicles
 

Remove ads by becoming a Premium User

Greek Street, Stockport - Railway Bridge Replacement Started Sun Mar 30 2025 Until Tue Mar 31 (Updated Tue Aug 5 2025 )
From 31 March 2025 until Spring 2026, Network Rail will be carrying out work to install a new railway bridge and roundabout. For the duration of the works, bus services are on diversion.

Vehicle YN61BGX Bee Network Waiting 24:46. 2:09 behind going Wythenshawe Hospital
aprchg Southmoor Road on Ledson Road Last seen 24:46

Vehicle YN62BXO Bee Network Waiting 19:02. 1:16 ahead of going Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 19:02

Vehicle LF69UYZ Battery bus Waiting 1:15:19. 2:27 behind going Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 1:15:19

Vehicle SA15VTX Bee Network 2:38 ahead of going Wythenshawe Interchange
aprchg Upavon Road on Peel Hall Road

Vehicle MJ74JMV 2:08 behind going Wythenshawe Hospital
past Flint Street on Shaw Heath

Vehicle LV74THX 0:43 ahead of going Stockport Interchange
at Wythenshawe Interchange on Poundswick Lane

Vehicle MJ74JOU 4:21 behind going Stockport Interchange
past Conway Road on Turves Road

Vehicle MJ74JNZ Waiting 1:48:54. 6:28 behind going Stockport Interchange
aprchg Stockport Interchange Last seen 1:48:30

Vehicle YN61BGK Bee Network 3:27 ahead of going Stockport Interchange
past Grand Central on Wellington Road South

Leaflet | Map data © OpenStreetMap contributors

Whitefield Park and Ride Started Thu Jan 1 Until Tue Mar 31 (Updated Mon Dec 22 )
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
Oldham Mumps Park and Ride Started Mon Jan 19 (Updated Mon Jan 5 )
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
Brooklands Park and Ride Starts Mon Mar 30 Until Fri Apr 10 (Updated Mon Feb 16 )
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
Piccadilly Tram Stop - Escalator Works Started Mon Feb 9 Until Sun Mar 22 (Updated Mon Jan 26 )
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.
Pool Street, Hindley - Bus Stop Closure Started Mon Mar 9 Until Tue Mar 10 (Updated Sat Mar 7 )
The bus stop on Pool Street, at the junction of Park Street is closed due to works taking place.