Cleveland RTA

 •  GL-Green Line

 
Map
 

Leaflet | Map data © OpenStreetMap contributors

E. 79th Street Blue-Green Line station improvements are underway. Station will be closed during construction. Started Wed Nov 19 2025 Until Wed Jan 1 3000
E. 79th Street Blue-Green Line station improvements are underway. The station will be closed during construction.

The #2 East 79th Street bus route will continue to service the station on weekdays. Seven-day RTA routes in the vicinity include the Red Line and the #14-#14A Kinsman bus route.
Track adjustments at Tower City through June 20 Started Tue Apr 28 Until Sun Jun 21
• Westbound Red, Blue, and Green Line trains arrive on Track 7.
• Westbound Red Line trains depart from Track 7.
• Eastbound Red Line trains arrive on Track 8.
• Eastbound Red, Blue and Green Line trains depart from Track 8.

June 6 exception:
• Westbound Red, Blue, and Green Line trains arrive on Track 8.
• Westbound Red Line trains depart from Track 8.
• Eastbound Red Line trains arrive on and depart from Track 13.
• Eastbound Blue and Green Line trains depart from Track 13.
• Waterfront Line trains depart from Track 8 for the Brazil vs. Egypt soccer game at Huntington Bank Field.
Shuttle Buses Replacing Rail Service on Green Line West Starts Sun Jun 21 Until Sun Aug 16
Blue and Green Line trains will not operate June 21-August 15, 2026.
Replacement bus service (#67R) will operate between Tower City and Warrensville Van Aken stations.
Replacement bus service (#68R) will operate between Tower City and Green Road stations.
#67R and #68R buses do not stop at the Tri-C-Campus District Station. Riders wishing to access this station can use the #15 Union-Harvard or #19/19A/19B –
Broadway bus lines.
The Tower City stop is located on W. Prospect at W. 3rd St. Please look for the special orange #67R and #68R bus signs to board the rail replacement buses.
The #67R and #68R buses will operate at the same hours and frequency as the Blue and Green train lines during this shutdown.
Full Blue and Green Line rail service will resume at start of service on Sunday, August 16, 2026.
Shuttle Buses Replacing Rail Service on Green Line East Starts Sun Jun 21 Until Sun Aug 16
Blue and Green Line trains will not operate June 21-August 15, 2026.
Replacement bus service (#67R) will operate between Tower City and Warrensville Van Aken stations.
Replacement bus service (#68R) will operate between Tower City and Green Road stations.
#67R and #68R buses do not stop at the Tri-C-Campus District Station. Riders wishing to access this station can use the #15 Union-Harvard or #19/19A/19B –
Broadway bus lines.
The Tower City stop is located on W. Prospect at W. 3rd St. Please look for the special orange #67R and #68R bus signs to board the rail replacement buses.
The #67R and #68R buses will operate at the same hours and frequency as the Blue and Green train lines during this shutdown.
Full Blue and Green Line rail service will resume at start of service on Sunday, August 16, 2026.