Halifax Transit

 •  7B-Peninsula

 
Map
 

Leaflet | Map data © OpenStreetMap contributors

Stop closure Barrington St After South St (6096) is closed for construction Started Mon Jan 8 2024 Until Wed Jan 1 3000
Stop Closure Notice:
Route: 7B Peninsula Inbound
Location: Barrington St After South St (6096)
Cause: Stop Closed Construction

Affected Stops:
Barrington St After South St (6096)
Stop closure Robie St Before Cedar St (8196) is closed for construction Started Thu Oct 10 2024 Until Wed Jan 1 3000
Stop Closure Notice:
Route: 7B Peninsula Inbound
Location: Robie St Before Cedar St (8196)
Cause: Stop Closed Construction

Affected Stops:
Robie St Before Cedar St (8196)
Stop closure Robie St After Jubilee Rd (8195) is closed for construction Started Mon Jul 7 Until Wed Jan 1 3000
Stop Closure Notice:
Route: 7B Peninsula Inbound
Location: Robie St After Jubilee Rd (8195)
Cause: Stop Closed Construction

Affected Stops:
Robie St After Jubilee Rd (8195)
Stop closure is closed for construction Started Wed Aug 6 Until Fri Aug 15
Stop Closure Notice:
Route: 7B Peninsula Inbound
Location:
Cause: Stop Closed Construction

Affected Stops: