Current time: Refresh

Agencies » Boise VRT

Route 9 Started Mon May 12 Until Wed Oct 1
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Route 7 and 8 - stop closure Started Thu Jun 19 Until Sat Aug 30
Outbound stop on Main and 23rd is closed and no temp stop placed due to construction in the area.

Remove ads by becoming a Premium User

 • : 7-Fairview at N Allumbaugh St SWC on W Fairview Ave

1: 3 - 6 Mins
at . 1:32 behind Vehicle 4002 Load 107%? 18:30:00-16 Towards Main Street Station
past Towne Square Mall P&R Only
2: 13 - 17 Mins
at . 0:53 ahead of Vehicle 802 Load 77%? 18:45:00-16 Towards Main Street Station
aprchg Milwaukee St NWC on N Milwaukee St Only
3: 32 - 35 Mins
at . 1:40 behind Vehicle 812 Load 117%? 19:00:00-16 Towards Main Street Station
past Main Street Station - Upper Deck Only
4: 47 - 50 Mins
at . 1:33 behind Vehicle 811 Load 99%? 19:15:00-16 Towards Main Street Station
at Main Street Station - Upper Deck Only
5: 1h17 - 1h19 Mins
at . 1:04 behind Vehicle 802 Load 197%? 19:45:00-16 Towards Main Street Station
aprchg Milwaukee St NWC on N Milwaukee St Only
MSS Closure Started Mon Jun 9 Until Mon Sep 1
All buses that normally use Main Street Station downstairs are relocated upstairs. Visit ridevrt.org/MSS25 for more information.
Route 7 and 8 - stop closure Started Fri Jun 27 Until Thu Jul 31
Outbound stop closed on Main and 27th due to construction and temp stop placed far-side of the intersection, right after the entrance to the Gas station.

Add stop (different agency)