Current time: Refresh

Agencies » Fort Wright TANK

The Dixie Hwy/Florence I Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29
The Dixie Hwy/Florence O Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until Jun 29

Remove ads by becoming a Premium User

 • : 1-Dixie Hwy/Florence at Cave Run on Dixie going Florence

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 18 - 25 Mins
at . 8:20 behind Vehicle 2229 Load 107%? Empty

2: 1h11 - 1h17 Mins
at . 0:49 behind Vehicle 2234 Load 87%?

The NULL Route(s) will operate Detour as the result of Construction starting 6/6/2024. Started Jun 5 Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.