Agencies » York Region YRT/Viva
• Viva Yellow
EFFECTIVE IMMEDIATELY
In an effort to limit the spread of the Novel Coronavirus COVID 19, the Boston Commuter service will be cancelled until further notice. We appreciate your patience and your understanding, and we will keep you informed of any further updates.
As a result of ongoing concerns for the health and safety of maintaining operations, as well as the recent decline in ridership, the Town’s Emergency Control Group (ECG) has decided to suspend Niagara-on-the-Lake Transit Service until further notice. Suspension is effective as of Thursday, April 9, 2020.
BC Transit continues to notify its riders that CUPE Local 561 operating under First Transit has increased job action and ceased service in the Agassiz-Harrison, Central Fraser Valley, Chilliwack and Hope transit systems. This service suspension remains in place until further notice, and impacts customers in the communities of Abbotsford, Agassiz-Harrison, Chilliwack, Hope, Mission and customers using the Fraser Valley Express.
handyDART service for customers requiring transportation to renal dialysis, cancer treatment and multiple sclerosis appointments in Abbotsford and Mission has been deemed essential and continues to operate during this service disruption. All other pre-booked trips will be notified of cancellation.
BC Transit is closely monitoring the situation and sincerely apologizes to customers for the inconvenience caused by this matter. We understand the frustration felt by customers, and that the job action is difficult for everyone involved in the region.
No Service due to Construction
Richmond Field Station Line No Service. Please use AC Transit Lines 51B and 52 to 4th Street District.
Jump to: ←West
| |||||||||||||
| |||||||||||||
The listed schedule in Transit app for the Downtown Looper is incomplete. The service operates every 15 minutes. Real-time information is displayed only for certain buses that arrive at each stop. Complete service schedules are posted at all Looper stops.
As of March 17, 2020, the MVRTA will be reducing service to and from Boston, until further notice. Only B1 & B6 will be running.
All passengers must wear a nose and mouth ceovering at all times. Thank you for your cooperation!
Todos los pasajeros deben cubrirse la nariz y la boca en todo momento. ¡Gracias por su cooperación!
Please be advised that Citilink buses cannot pick up or drop off in construction zones with orange cones and barrels. If you're in one, please move to the nearest safe corner outside of the zone. Click here to read more: https://fwcitilink.com/rideralerts/. Thank you!
Updated schedules go into effect Sunday, January 11.
Check for changes to your route at:
sctransit.com/all-routes
Reserve rides in advance from March 22 to April 1. Visit cata.org/holidays.
Significant delays due to striping operations.
SERVICE ALERT: Routes 1 and 2 will not operate 30-minute service from 3:30 PM to 6:30 PM today, Monday, March 30.
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.