Agencies » Vancouver TransLink
• 3-Main/Waterfront Station
Jump to: ↓South
|
|
Stop 50250 Southbound Main St @ E 36 Ave is temporarily closed from Thu May 29 to Mon Jun 30 from 9:30 AM to 3:00 PM daily on weekdays only due to construction. Starts Mon Jun 30 Until Mon Jun 30
3 Waterfront Station detour from 9:30 AM to 9:00 PM on Sat Jun 21. Regular route to Main and Pender, via Pender, Homer, Hastings, resume regular route due to special event. Starts Sat Jun 21 Until Sat Jun 21
More...
More...
Stop 50233 Main Street-Science World Station @ Bay 1 has temporarily moved 150m from Thu Jun 19 to Sun Jun 22 from 10:00 PM to 5:00 AM nightly due to construction. Starts Fri Jun 20 Until Sat Jun 21
Moved to Stop 50232 (Main St and National Ave)
Moved to Stop 50232 (Main St and National Ave)
Stop 50852 Westbound W Hastings St @ Richards St has temporarily moved east to Hastings St @ Homer St from Mon Jun 16 to Fri Jun 20 from 7:00 AM to 3:00 PM daily due to construction. Starts Fri Jun 20 Until Fri Jun 20
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.