Agencies » San Diego MTS
• 901-Iris Transit Center - Downtown
Jump to: ↓South
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Due to construction, the 115 Eastbound will have a bus stop closure at Jackson Dr. and Lake Badin Dr. from Monday 03/09/26 at 3:00AM to Thursday 03/12/26 at 11:59PM. Passengers are advised to make connections at Jackson Dr. and Boulder Lake Dr. Stop ID#10325.
Blue Line trolleys are delayed. Displayed times may not reflect delays.
Due to construction on eastbound Washington at India, the stop will be closed from 3/9/26 to 7/31/26 (24hrs). Passengers are directed to catch the eastbound route 10 at the temporary A-Frame on Washington, westside of San Diego Ave.
Green Line trolleys are delayed. Displayed times may not reflect delays.
Orange Line trolleys are delayed. Displayed times may not reflect delays.
Due to construction, Route 227, Route 901, and Route 933 bus stop #60041 (toward Iris Transit Center) and bus stop #60042 (toward Seacoast & Downtown) will be temporarily closed from March 2 through March 18, 24 hours a day.
Toward Iris Transit Center:
Passengers are advised to make connections at Coronado Ave & Nestor Way, southwest corner.
Toward Seacoast Dr / Downtown:
Passengers are advised to use the temporary stop located approximately 260 feet west of the original stop.
Please be advised: Due to ongoing construction, the right eastbound and westbound lanes are closed, which may cause traffic delays.
Due to road work, Route 856 Northbound has a bus stop closure At Jamacha Rd & Campo Rd Bus Stop(ID #40305) on Thursday, March 12, 2026 through Friday, March 13, 2026 from 4am to 4pm.