Agencies » Baltimore MTA
• CityLink NAVY-Mondawmin - Dundalk
CityLink Navy Detour Started Tue Apr 22 Until Tue Apr 29
Due to construction at Main Street and Chestnut Street. A detour has been established until April 29th, 2025, affecting the Citylink Navy.
Due to construction at Main Street and Chestnut Street. A detour has been established until April 29th, 2025, affecting the Citylink Navy.
CityLink Navy and LocalLink 62 Detour Started Tue Apr 22 Until Tue Apr 29
Due to construction on Main Street between Avon Beach Road and Oak Street, a detour has been implemented until April 29th, 2025, affecting the CityLink Navy and LocalLink 62.
Due to construction on Main Street between Avon Beach Road and Oak Street, a detour has been implemented until April 29th, 2025, affecting the CityLink Navy and LocalLink 62.
Jump to: →East
|
|
|
Additional Stops:
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.