• Kitchener
Jump to: →East
| ||||||||||||||||||||||||||||
Additional Stops:
The north bus loop at Brampton Transit Terminal is closed due to construction of the underground parking lot. Temporary bus stops have been set up on Main Street. GO bus routes 31 & 33- Eastbound: Stop is located on the west side of Main St. N. – exit to Main St. N, turn left and proceed about 85 metres north.- Westbound: Stop is located on the east side of Main St. N. at Church St. E. – exit to Main St. N., turn left and proceed about 125 metres north toward Church St. E. GO bus route 37- Northbound: Stop is located on the east side of Main St. N., just north of the terminal – exit to Main St. N. and turn left.- Southbound: Route ends on the west side of Main St. N, near the terminal. Additional Information- Accessible parking spaces remain available in the main parking lot.- Work is expected to be completed in August 2026. - Please follow directional signage and use caution around construction areas.
The entrance from the Bay Concourse to the Scotiabank Galleria will be closed Monday to Friday from 22:00 to 6:00 due to construction.Please exit via the north pedestrian bridge or the outdoor route through the Bay South Teamway.
The weekend of July 25-26, service will be adjusted due to planned construction. Please plan ahead.
A portion of the main parking lot and one lane in the passenger pick-up and drop-off area are temporarily closed for concrete and repaving work and installation of garbage enclosure. Here’s what you need to know:- 240 parking spaces are temporarily closed. - Please use other available parking lots at this station.- For additional parking, please use Bramalea GO; which is approximately a 20-minute drive from Brampton Innovation District GO.- Work is expected to be completed in Aug. 2026.- Please follow directional signage and use caution around construction areas.
This weekend, service is adjusted on Lakeshore West, the Barrie and Kitchener lines, and UP Express due to planned construction. Please plan ahead and check schedules before travelling.Learn more about these service adjustments.
On Saturday July 25 and Sunday July 26, planned construction is taking place on the Kitchener line.GO buses replace train service between Stratford or Kitchener and Mount Pleasant GO stations.GO trains will run hourly between Mount Pleasant and Mount Dennis GO stations. There will be no GO transit service between Mount Dennis and Union Station.From Mount Dennis GO, take the Eglinton Crosstown Light Rail Train (ECLRT) to Cedervale, then transfer south on Line 1 to Union. There will be select GO buses running between Stratford or Kitchener GO and Hwy 407 Bus Terminal.GO bus routes 30 and 31 will also have connections between Bramalea GO and Hwy 407 Bus Terminal where you can connect with TTC Line 1 to Union Station.The bus route 33 will connect between Mount Pleasant GO and Georgetown, Acton, and GuelphKitchener line train service resumes Monday, July 27 with some trips and schedules adjusted until Tuesday, July 28.Learn more.