Agencies » GO Transit
• Milton
A heat warning is in effect today for our service area. During extreme heat, we conduct heat related track patrols to inspect the rails, and we operate at slower speeds to keep you moving safely. As a result, trips operating on your line today may arrive 15 to 20 minutes later than originally scheduled at their destination. We expect all trips to begin as scheduled. Please stay well hydrated, drink plenty of water and bring enough for your entire trip as not all GO stations have food or beverage options available. Plan ahead and give yourself extra time for travel. Check our Service Updates page for real-time information on GO service. Our teams are monitoring the track conditions, and we will continue to update you as more information becomes available. Your safety is our top priority, thank you for riding with GO!
Jump to: →East
| ||||||||||||||||||||
| ||||||||||||||||||||
Platform rehabilitation has begun at Milton GO on the east side of the platform, to modify and replace existing platform infrastructure to enhance safety and accessibility. How you board your train is affected. The east side of the platform is temporarily closed. Trains will be available for boarding at the west side of the platform. Learn more about this construction.
The entrance from the Bay Concourse to the Scotiabank Galleria will be closed Monday to Friday from 22:00 to 6:00 due to construction.Please exit via the north pedestrian bridge or the outdoor route through the Bay South Teamway.