Agencies » GO Transit
• Kitchener
Jump to: →East
|
| ||||||||||||||||||||||||||||||||||||
April 18-19: GO buses run direct between Bramalea GO and Highway 407 Bus Terminal due to planned construction.
April 18-19: No GO Transit service at Malton GO due to planned construction. Sign up for On the GO alerts.
April 18-19: No GO Transit service at Etobicoke North GO due to planned construction. Sign up for On the GO alerts.
April 18-19: No GO Transit service at Weston GO due to planned construction. Sign up for On the GO alerts.
April 18-19: No GO Transit service at Mount Dennis GO due to planned construction. Sign up for On the GO alerts.
April 18-19: No GO Transit service at Bloor GO due to planned construction. Sign up for On the GO alerts.
The north bus loop at Brampton Transit Terminal is closed due to construction of the underground parking lot. Temporary bus stops have been set up on Main Street. GO bus routes 31 & 33- Eastbound: Stop is located on the west side of Main St. N. – exit to Main St. N, turn left and proceed about 85 metres north.- Westbound: Stop is located on the east side of Main St. N. at Church St. E. – exit to Main St. N., turn left and proceed about 125 metres north toward Church St. E. GO bus route 37- Northbound: Stop is located on the east side of Main St. N., just north of the terminal – exit to Main St. N. and turn left.- Southbound: Route ends on the west side of Main St. N, near the terminal. Additional Information- Accessible parking spaces remain available in the main parking lot.- Work is expected to be completed in August 2026. - Please follow directional signage and use caution around construction areas.