Agencies » Boston MBTA

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL3-Chelsea Station - South Station, SL1-Logan Airport Terminals - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice pending replacement. Started Tue Mar 15 2022
More...
Route: Blue Line
Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice pending replacement. Started Wed Mar 22 2023
Route: Red Line
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable Started Thu Jun 13 2024
Route: Haverhill Line
State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable Started Mon Mar 31
Route: Orange Line
Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance. Started Wed Apr 23
Route: Haverhill Line
Braintree Elevator 811 (Red Line platform to lobby) will be unavailable through Friday, August 22 for major equipment upgrades that will significantly improve the long-term reliability of the elevator. Started Mon Jun 30 Until Sat Aug 23
More...
Route: Red Line
Assembly Escalator 442 (Foley Street to unpaid lobby) unavailable due to maintenance Started Tue Jun 24
Route: Orange Line
Hynes Convention Center Escalator 315 (Kenmore & West platform to paid lobby) unavailable from Mon Aug 4 through Thu Aug 21 due to maintenance Starts Mon Aug 4 Until Fri Aug 22
Routes: D-Green Line D, B-Green Line B, C-Green Line C
Park Street Escalator 373 (Alewife platform to Tremont Street) unavailable from Mon Sep 8 through Thu Sep 25 due to maintenance Starts Mon Sep 8 Until Fri Sep 26
Route: Red Line
State Elevator 803 (Forest Hills platform to Washington Street, Milk Street) unavailable due to maintenance Started Wed Jul 23
More...
Routes: Blue Line, Orange Line
Elevator #779 from the pedestrian bridge to the platform is temporarily out of service at East Taunton until further notice. Please use the accessible ramp for access to the platform. Started Fri Jul 25
Route: Fall River/New Bedford Line
South Station Escalator 419 (Lobby to South Station platform) unavailable through Fri Aug 1 due to maintenance Started Fri Jul 25 Until Sat Aug 2
Routes: SLW-Silver Line Way - South Station, Red Line, SL2-Design Center - South Station, SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station
Park Street Escalator 320 (Government Center & North platform to Park Street) unavailable due to maintenance Started Mon Jul 28
Routes: D-Green Line D, Red Line, B-Green Line B, E-Green Line E, C-Green Line C
Ruggles Escalator 136 (Orange Line platform to upper lobby) unavailable Started Thu Jul 31
Route: Orange Line
Science Park/West End Elevator 980 (Copley & West platform to lobby) unavailable due to maintenance Started Thu Jul 31
More...
Routes: D-Green Line D, C-Green Line C, B-Green Line B, E-Green Line E
Route 426 outbound is detoured nightly, Sunday through Thursday, from 7 PM to end of service for construction. Connect at: Market Sq @ Western Ave & S Common St @ Market St. Starts Thu Jul 30 2026 Until Fri Jul 31 2026
More...
Route: 426-Central Square, Lynn - Haymarket or Wonderland Station
Route 99 detoured due to construction. Connect inbound at Highland Ave @ Pine St & Clifton St @ Dexter St. Outbound at Clifton St @ Highland Ave & 617 Highland Ave. Started Wed Apr 9
More...
Route: 99-Woodland Road - Wellington Station
Routes 71 and 73 detoured beginning Sat Jul 19 due to construction. The nearest connections are Mt Auburn St @ Mt Auburn Hospital or Mt Auburn St @ Traill St. Started Sat Jul 19
More...
Routes: 71-Watertown Square - Harvard Station, 73-Waverley Square - Harvard Station
George's Island will remain closed until further notice due to maintenance work. Started Sat Jul 12
Affected routes:
Hingham/Hull Ferry
Route: Boat-F1
Blue Line: Shuttle buses will replace service between Airport & Wonderland, Aug 9 - 17, due to maintenance. Riders should expect longer travel times during this work. Starts Sat Aug 9 Until Mon Aug 18
More...
Route: Blue Line
Orange Line: Service will be suspended between Wellington and Back Bay the weekend of Aug 2 - 3 for signal system upgrades. Use shuttles between Wellington & North Station. Use Green Line between North Station & Copley/Back Bay. Starts Sat Aug 2 Until Mon Aug 4
More...
Route: Orange Line
Please board Providence Line Train 5893 (11:55 pm from South Station) on the inbound platform (Track 4) at Attleboro though mid-October. Starts Sun Jul 26 2026 Until Mon Jul 27 2026
More...
Route: Providence/Stoughton Line
Lynn Ferry notice: Due to expected high winds today, August 1, riders may experience rough seas during their commute. Started Until Fri Aug 1
Route: Boat-Lynn
Route 455 is experiencing delays of up to 25 minutes Started Until
Route: 455-Salem Depot - Wonderland Station
Route 211 detoured. Connection points at Huckins Ave @ E Squantum St and Huckins Ave @ Bellevue Rd Started Until
More...
Route: 211-Quincy Center Station - Squantum
Please board all Fairmount Line trains on the outbound platform (Track 1) at Newmarket, Uphams Corner, and Four Corners/Geneva until further notice today. Started Until
More...
Route: Fairmount Line
Please board all Lowell Line trains on the inbound platform (Track 2) at North Billerica until further notice today. Started Until
Affected stops:
North Billerica
Route: Lowell Line
Route 435 detoured. Connection points at Central St @ Walnut St and Andover St @ Pound Ln Started Until
More...
Route: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square
Please board all Framingham/Worcester Line trains on the outbound platform (Track 1) at Wellesley Farms through West Natick until further notice today. Started Until
More...
Route: Framingham/Worcester Line
Route 47 INBOUND ONLY detoured due to construction. INBOUND connections can be made on Green St @ Pearl St or on Mountfort St @ Lenox St. Started Until
More...
Route: 47-Central Square, Cambridge - Broadway Station
Please board all Framingham/Worcester Line trains on the inbound platform (Track 5) at Back Bay and Lansdowne until further notice today. Started Until
Affected stops:
Back Bay
Lansdowne
Route: Framingham/Worcester Line
Haverhill Line Train 232 (9:57 am from Haverhill) is operating 20-30 minutes behind schedule between North Wilmington and North Station due to a signal issue. Started Until
More...
Route: Haverhill Line
Foxboro Line Train 1731 (10:35 am from South Station) is stopped after Ruggles and is 25-35 minutes behind schedule due to a downed wire. Started Until
Affected direction: Outbound
Route: Franklin/Foxboro Line
Providence Line Train 831 (10:25 am from South Station) is operating 25-35 minutes behind schedule between Ruggles and Providence due to a downed wire. Started Until
More...
Route: Providence/Stoughton Line
Foxboro Line Train 1732 (10:36 am from Foxboro) will bypass Ruggles and Back Bay today due to a downed wire. Passengers for Ruggles and Back Bay will be accommodated by a free connection to the Red Line at South Station. Started Until
Affected direction: Inbound
Route: Franklin/Foxboro Line
Please board Foxboro Line Train 1731 (10:35 am from South Station) on the inbound platform (Track 2) at Hyde Park today. Started Until
More...
Route: Franklin/Foxboro Line
Franklin Line Train 735 (11:25 am from South Station) will by pass Back Bay, Ruggles, & Hyde Park today due to a downed wire. Started Until
Affected direction: Outbound
Route: Franklin/Foxboro Line
Lynn Parking Garage arcade stairs 1 and 2 are closed until further notice due to structural issues. Customers may exit the garage via elevators to the ground level or by using the south stairs located on the Market street side of the garage. Started Thu Nov 4 2021
Vehicular access to the upper 2 levels of the garage is restricted. The garage has sufficient parking capacity to accommodate daily demand.
Routes: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street, 455-Salem Depot - Wonderland Station, 456-Salem Depot - Central Square, Lynn, 436-Liberty Tree Mall - Central Square, Lynn via Goodwin Circle, 439-Nahant - Wonderland Station, 441-Marblehead - Wonderland Station via Paradise Road, 426-Central Square, Lynn - Haymarket or Wonderland Station, 429-Northgate Shopping Center - Central Square, Lynn
Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work through 2025. More information is available at https://www.town.hull.ma.us/ Started Thu Jun 27 2024
Route: Boat-F1
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, Fairmount Line, Foxboro Event Service, SL2-Design Center - South Station, Franklin/Foxboro Line, Red Line, Kingston Line, Fall River/New Bedford Line, Framingham/Worcester Line, Greenbush Line, Needham Line, Providence/Stoughton Line
Alewife Garage: The main vehicle entry and exit has reopened at the garage. Started Mon Apr 7 Until Fri Aug 8
Routes: 62-Bedford VA Hospital - Alewife Station, 350-North Burlington - Alewife Station, 67-Turkey Hill - Alewife Station, 62/76-Bedford VA Hospital - Alewife Station via Hanscom Airport, Red Line, 76-Lincoln Lab - Alewife Station
Construction is ongoing in the Hingham Parking lot and on Shipyard Drive in preparation for the Hingham Ferry Dock upgrades. There is reduced parking in the lot, and portions of Shipyard Drive are affected. Started Fri Apr 18
There may also be pedestrian detours in the parking lot due to the construction.
Route: Boat-F1
The Bus Stop at Saint James Ave @ Dartmouth St is closed until further notice due to construction. Riders should use a nearby temporary bus stop at Saint James Ave @ Clarendon St. Started Mon May 5
More...
Routes: 10-City Point - Arlington Station, 39-Forest Hills Station - Back Bay Station, 501-Brighton Center - Federal Street & Franklin Street, 504-Watertown Yard - Federal Street & Franklin Street, 55-West Fenway - Arlington Station, 9-City Point - Copley Square
The following stop is closed Monday through Thursday, from 7AM to 5PM, due to construction until further notice: Hawthorne St @ Broadway (outbound). See additional info for alternative stops. Starts Thu Jul 30 2026 Until Thu Jul 30 2026
More...
Routes: 104-Malden Center Station - Airport Station, 111-Woodlawn - Haymarket Station, 112-Wellington Station - Wood Island Station, 114-Market Basket - Maverick Station, 116-Wonderland Station - Maverick Station
The Washington Ave @ Broadway stop is closed from 7 AM - 5 PM, Monday through Thursday, until further notice for construction. Riders can board at Washington Ave @ Chestnut St. Starts Thu Jul 30 2026 Until Thu Jul 30 2026
More...
Routes: 104-Malden Center Station - Airport Station, 111-Woodlawn - Haymarket Station, 112-Wellington Station - Wood Island Station, 114-Market Basket - Maverick Station, 116-Wonderland Station - Maverick Station
The Route 47 Green St @ Magazine St bus stop is temporarily closed for construction through Tuesday, September 30th, 2025. Please board at Green St @ Pearl St for inbound service to Broadway. Started Tue Jul 8 Until Wed Oct 1
Route: 47-Central Square, Cambridge - Broadway Station
Due to construction, the driveway between Shipyard Drive and the MBTA Parking lot (west of “Lot H”) will be subject to full closure between 8 AM and 3 PM weekdays, through Friday, August 1. Started Until
Route: Boat-F1
Quincy Ferry notice: Due to expected high winds today, August 1, riders may experience rough seas during their commute. Started Until Fri Aug 1
Route: Boat-F7
Winthrop Ferry notice: Due to expected high winds today, August 1, riders may experience rough seas during their commute. Started Until Fri Aug 1
Route: Boat-F6
Providence Line Train 832 (10:15 am from Providence) has departed Providence and is operating 5-10 minutes behind schedule due to an earlier switch issue. Started Until
Affected direction: Inbound
Route: Providence/Stoughton Line
Fitchburg Line Train 416 (9:25 am from Wachusett) is operating 5-15 minutes behind schedule between Ayer and North Station. Started Until
More...
Route: Fitchburg Line
Haverhill Line Train 229 (9:40 am from North Station) is operating 5-15 minutes behind schedule between Reading and Haverhill due to a signal issue. Started Until
More...
Route: Haverhill Line
Route 51 is experiencing delays of up to 20 minutes due to disabled bus Started Until
Route: 51-Reservoir Station - Forest Hills Station
Route 34 is experiencing delays of up to 20 minutes due to disabled bus Started Until
Route: 34-Dedham Square - Forest Hills Station
Newburyport Line Train 130 (9:55 am from Newburyport) is operating 5-15 minutes behind schedule between Salem and North Station. Started Until
More...
Route: Newburyport/Rockport Line
Stoughton Line Train 930 (10:15 am from Stoughton) is operating 5-15 minutes behind schedule between Hyde Park and South Station. Started Until
More...
Route: Providence/Stoughton Line
Route 14 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 14-Roslindale Square - Heath Street
Route 29 is experiencing delays of up to 20 minutes due to traffic Started Until
Route: 29-Mattapan Station - Jackson Square Station
Winthrop Ferry Trip 11:15 am from Winthrop Landing to Seaport/Fan Pier cancelled today due to a mechanical problem. Started Until
Route: Boat-F6
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. Started Mon Jan 24 2022
Route: Framingham/Worcester Line
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance. Started Fri Jun 30 2023
Affected lines:
Fall River/New Bedford Line
Route: Fall River/New Bedford Line
Littleton/Route 495 passengers can expect occasional traffic and detours accessing the station due to the Foster Street reconstruction work. Started Wed Feb 5
Scheduled to complete sometime in 2027, the Reconstruction of Foster Street includes widening and resurfacing with the addition of bicycle lanes.
Route: Fitchburg Line
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28
More...
Route: Framingham/Worcester Line
The Route 442 stop at Humphrey St @ Eastern Ave (inbound) will be temporarily moved due to construction until mid-September. Riders can board at the corner of Humphrey St and Kings Beach Terrace. Started Fri May 2 Until Mon Sep 15
Affected routes:
442
Routes: 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street
Starting Monday, June 2nd, the Fairmount Line will have a temporary schedule to allow for rail replacement work. The schedule reduces mid-day service on weekdays and service on weekends. Schedule is now available on MBTA.com/CR. Started Mon Jun 2
More...
Route: Fairmount Line
Starting Monday, June 2nd, the Franklin Line will have an adjusted weekend schedule with certain trains bypassing Fairmount through Newmarket & making stops at Back Bay & Ruggles due to the Fairmount Line temporary construction schedule. Started Mon Jun 2
More...
Route: Franklin/Foxboro Line
The Broadway @ Windsor St (inbound) Bus stop will be permanently moved to the far side of Windsor St beginning June 26. Started Thu Jun 26
Affected routes:
64
68
Routes: 64-Oak Square - University Park or Kendall/MIT Station, 68-Harvard Square - Kendall/MIT Station
Jackson Square: The stairway connecting the Jackson Sq lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator. Started Mon Jun 30
Route: Orange Line
Jackson Square: The platform is undergoing renovations until fall 2025 to improve safety and accessibility. Sections of the platform will be unlevel during this period, which may make it difficult for some riders to board and exit trains. Started Mon Jun 30
Please see station personnel or use a station call box to request assistance.
Route: Orange Line
Route 354 bus stop at Common St @ Woburn City Hall (inbound) has moved to Pleasant St @ Woburn District Court. This is a new MBTA bus stop located in front of Woburn District Court. Started Thu Jul 3
Affected routes:
354
Route: 354-North Burlington - State Street, Boston
To accommodate Providence Station Renovations, construction barriers have been installed and the Southern stairwell to Track 1 & 3 is out of service. The Northern access is open. Started Thu Jul 17
Affected lines:
Providence/Stoughton Line
Foxboro (Special Events)
Routes: Foxboro Event Service, Providence/Stoughton Line
Hingham Ferry Dock: Due to construction activities associated with the dock replacement project, the driveway between Shipyard Drive and the MBTA Parking lot (west of “Lot H”) is closed between 8 AM and 3 PM weekdays, through August 1. Started Until
Route: Boat-F1
Beginning Monday, July 28th, the outbound platform at Natick Center will be open and accessible by elevator or stairs using the North Ave entrance. Started Mon Jul 28 Until Sat Aug 2
Affected lines:
Framingham/Worcester Line
Route: Framingham/Worcester Line
On the weekends of August 16th-17th & 23rd-24th, Red and Green Line subway service will replace regular Commuter Rail service between North Station and Porter. Starts Sat Aug 16 Until Mon Aug 25
More...
Route: Fitchburg Line
Starting at 10pm on Friday, August 15th through Sunday, August 17th & at 10pm on Friday, August 22nd through Sunday, August 24th, shuttle buses will replace train service between North Station and Lowell. Starts Fri Aug 15 Until Mon Aug 25
More...
Route: Lowell Line