Agencies » AC Transit

Blanding at Broadway Stop Closed
Blanding Ave. at Broadway Stop Closed

Due to: Construction

Effective: January 29 – March 20

Please see the AC Transit website for more information: https://www.actransit.org/node/30699
---
Cierre de la parada en Blanding Ave. con Broadway

Debido a: Trabajos de construcción

Efectivo: 29 de enero – 20 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/30699
---
Blanding Ave. 和 Broadway 交叉口站暂停服务行

由于: 施工

生效日期: 1 月 29 日 – 3 月 20 日

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/30699
Routes: 19-Alameda Pt-Buena Vista-Fruitvale, 51A-Broadway - Santa Clara, 851-Santa Clara-Broadway All Nighter
14th Ave. at 33rd St Stop Closed
14th Ave. at E. 33rd St. Stop Closure

Due to: Stop optimization

Effective: Until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/28471
---
Parada cerrada en 14th Ave. con E. 33rd St.

Debido a: Optimización de parada

Efectivo: Inmediatamente hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/28471
---
14th Ave. 和 E. 33rd St. 交叉口站暂停服务

由于: 停车优化

生效日期: 即生 直到 另行通知

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/28471
Routes: 57-40th St. - MacArthur, 62-7th St. - San Antonio - 23rd Av., 653-Montera - MacArthur, 657-Oak High - Oak Tech - MacArthur, 658-Skyline - Bret Harte - MacArthur, 680-Bishop O'Dowd High - MacArthur, 805-MacArthur - Airport All Nighter, 96-Alameda Pt. - 14th Ave. - Dimond, NX-Grand Lake - Laurel Transbay
Meekland Ave. Stops Closed
Meekland Ave. Stops Closed

Due to: Construction

Effective: March 3 – May 29

Please see the AC Transit website for more information: https://www.actransit.org/node/31270
---

Cierre de las paradas en Meekland Ave.

Debido a: Trabajos de construcción

Efectivo: 3 de marzo – 29 de mayo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31270

---

Meekland Ave. 车站关闭

由于:施工

生效时间:3 月 3 日至 5 月 29 日

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31270
Route: 34-Estudillo - Davis - Meekland
Mission Blvd. Stop Closures
Mission Blvd. Stops Closed

Due to: Construction

Effective: October 8 Until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/22525
---
Cierre de la paradas en Mission Blvd.

Debido a: Trabajos de construcción

Efectivo: 8 de Octubre hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/22525
---
Mission Blvd. 巴士站关闭

由于: 施工

生效日期: 10月8日 到直到 另行通知 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/22525

Routes: 801-E 14th - Mission All Nighter, 9-E. 14th St. - Mission
Ralph Appezzat Pkwy Stop Closed
Ralph Appezzato Memorial Pkwy. at 3rd St. Stop Closed

Due to: Operational issues

Effective: As of March 2 until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/30495
---
Cierre de la parada en Ralph Appezzato Memorial Pkwy. con 3rd St.

Debido a: Problemas de funcionamiento

Efectivo: A partir del 2 de marzo hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/30495
---
Ralph Appezzato Memorial Pkwy. 和 3rd St. 交叉口站暂停服务

由于: 运行问题

生效日期: 3 月 2 日起 直到 另行通知 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/30495
Route: 19-Alameda Pt-Buena Vista-Fruitvale
Solano Ave. Detour
Solano Ave. Detour

Due to: Event

Effective: 9:00 a.m. – 10:00 a.m. March 14

Please see the AC Transit website for more information: https://www.actransit.org/node/24840

---

Desvíos en Solano Ave.

Debido a: Evento

Efectivo: 9:00 a.m. – 10:00 a.m. 14 de Marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/24840

---

Solano Ave. 巴士绕行

由于:事件

生效时间:3 月 14 日,上午 9:00 至上午 10:00

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/24840
Routes: 18-Solano - Shattuck - Park Blvd., G-Colusa - Solano Transbay
N Milpitas at Hanson Stop Closed
N. Milpitas Blvd. and Hanson Ct. Stop Closed

Due to: Service change

Effective: Immediately until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/29787
---
Cierre de la parada en N. Milpitas Blvd. con Hanson Ct.

Debido a: Cambio en el servicio

Efectivo: Inmediatamente hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/29787
---
N. Milpitas Blvd. 和 Hanson Ct. 交叉口站暂停服务

由于: 服务调整

生效日期: 即生 直到 另行通知

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/29787
Route: 231-Fremont Blvd-Warm Springs-Milpa.
Grant Av at Bockman Stop Closed
Grant Ave. at Bockman Rd. Stop Closed

Due to: Operational issues

Effective: Immediately until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/30973
---
Cierre de la parada en Grant Ave. con Bockman Rd.

Debido a: Problemas de funcionamiento

Efectivo: Inmediatamente hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/30973
---
Grant Ave. 和 Bockman Rd. 交叉口站暂停服务

由于: 运行问题

生效日期: 即生 直到 另行通知 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/30973

Route: 93-Ashland - San Lorenzo - A St.
Hillmont Dr. Detour
Hillmont Dr. Detour

Due to: utility maintenance

Effective: 6:45 a.m. – 4:30 p.m. daily, March 16 – 20

Please see the AC Transit website for more information: https://www.actransit.org/node/31406
---
Desvíos en Hillmont Dr.

Debido a: Mantenimiento de servicios públicos

Efectivo: 6:45 a.m. – 4:30 p.m. diario, 16 – 20 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31406
---
Hillmont Dr. 巴士绕行

由于: 公用事业维护

生效日期: 3 月 16 日至 20 日,每天上午 6:45 至下午 4:30

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31406
Routes: 45-Seminary - Sobrante Park, 617-Skyline High - Seminary, 650-Montera - Oakmore - Seminary
Cabot at Bernhardt Stop Closed
Cabot Blvd. at Bernhardt St. Stop Closed

Due to: Stop Optimization

Effective: Immediately until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/31353
---
Cierre de la parada en Cabot Blvd. con Bernhardt St.

Debido a: Optimización de parada

Efectivo: Inmediatamente hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31353
---
Cabot Blvd. 和 Bernhardt St. 交叉口站暂停服务

由于: 停车优化

生效日期: 即生 直到 另行通知 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31353
Route: 86-Winton - Industrial - Tennyson
MLK & 36th St. Stop Closed
Martin Luther King Jr. Way at 36th St. Stop Closed

Due to: Operational issues

Effective: Until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/26573
---
Cierre de la parada en Martin Luther King Jr. Way con 36th St.

Debido a: Problemas de funcionamiento

Efectivo: Inmediatamente hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/26573
---
Martin Luther King Jr. Way 和 36th St. 交叉口站暂停服务

由于: 运行问题

生效日期: 即生 直到 另行通知 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/26573
Route: 18-Solano - Shattuck - Park Blvd.
Fremont at Grimmer Stop Closed
Grimmer Blvd. at Fremont Blvd. Stop Closed

Due to: Construction

Effective: October 23 until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/22769
---
Cierre de la parada en Grimmer Blvd. con Fremont Blvd.

Debido a: Trabajos de construcción

Efectivo: 23 de Octubre hasta nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/22769
---
Grimmer Blvd. 和 Fremont Blvd. 交叉口站暂停服务

由于: 施工

生效日期: 10 月 23 日 另行通知.

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/22769
Route: 239-Pacific Cm.-Grimmer-Warm Springs
Line 18 Detour
Montclair Village Detour

Due to: Construction

Effective: 8:00 p.m. March 12 – 5:00 a.m. March 13

Please see the AC Transit website for more information: https://www.actransit.org/node/19979
---
Desvío en Montclair Village

Debido a: Trabajos de construcción

Efectivo: 8:00 p.m. 12 de marzo – 5:00 a.m. 13 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/19979
---
Montclair Village 巴士绕行

由于: 施工

生效日期: 3月12日晚上8:00,到3月13日早上5:00 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/19979
Route: 18-Solano - Shattuck - Park Blvd.
Bus Stop Installation Delayed
Willie Stargell Ave. Bus Stop Installation Delayed

Due to construction delays, the installation of Line 19 stops along Willie Stargell Ave. has been delayed. Please use the regular stops listed below until further notice.

To Downtown Oakland

5th St. at Singleton Ave. (Stop ID 51752)
W Atlantic Ave. at Main St. (Stop ID 52827)

To Fruitvale BART

W Atlantic Ave. at Orion St. (Stop ID 52835)
5th St. at Singleton Ave. (Stop ID 51753)
Route: 19-Alameda Pt-Buena Vista-Fruitvale
Bancroft & Dolores Stop Moved
Bancroft Ave. at Dolores Ave. Permanent Stop Moved

Due to: Stop optimization

Effective: As of March 9

Please see the AC Transit website for more information: https://www.actransit.org/node/31321
---
Traslado de paradas permanente en Bancroft Ave. con Dolores Ave.

Debido a: Optimización de parada

Efectivo: A partir del 9 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31321
---
Bancroft Ave. 和 Dolores Ave. 处永久车站搬迁

由于: 停车优化

生效日期: 3 月 9 日起.

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31321
Route: 40-Foothill - Bancroft - Bay Fair
University & Kala Bagai Closed
University Ave. at Kala Bagai Way Stop Closed

Due to: Construction

Effective: 7:00 a.m. – 4:00 p.m. weekdays, February 2 – March 31

Please see the AC Transit website for more information: https://www.actransit.org/node/28990
---
Cierre de la parada en University Ave. con Kala Bagai Way

Debido a: Trabajos de construcción

Efectivo: 7:00 a.m. – 4:00 p.m. entre semana, 2 de febrero – 31 de Marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/28990
---
University Ave. 和Kala Bagai Way 交叉口站暂停服务

由于: 施工

生效日期: 2 月 2 日至3 月 31 日,工作日上午 7:00 至晚上 4:00.

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/28990
Routes: 52-UC Village - Cedar - UC Campus, 604-Head Royce - OHDS - Berkeley, 605-Head Royce - Montclair - College
Uptown TC Stops Closed
Uptown Transit Center Stops Closed

Due to: Construction

Effective: 9:00 a.m. – 6:00 p.m. daily, March 16 – April 3

Please see the AC Transit website for more information: https://www.actransit.org/node/31357
---
Cierre de las paradas en Uptown Transit Center

Debido a: Trabajos de construcción

Efectivo: 9:00 a.m. – 6:00 p.m. diario, 16 de marzo – 3 de abril

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31357
---
Uptown Transit Center 车站关闭

由于: 施工

生效日期: 3 月 16 日至 4 月 3 日,每天上午 9:00 至下午 6:00 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31357
Routes: 18-Solano - Shattuck - Park Blvd., 6-Berkeley - Telegraph - Oakland, 800-Rich - Oak Transbay All Nighter, 72-CCC - San Pablo, 72L-San Pablo Limited, 72M-Macdonald - San Pablo, 802-San Pablo All Nighter, NL-MacArthur Transbay Limited
Oxford at Berkeley Way Moved
Oxford St. at Berkeley Way Stop Moved

Due to: Stop optimization

Effective: As of February 24

Please see the AC Transit website for more information: https://www.actransit.org/node/31150
---
Parada de Oxford St. en Berkeley Way trasladada

Debido a: Optimización de parada

Efectivo: A partir del 24 de febrero

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31150
---
Oxford St. 和 Berkeley Way 交叉口站暂停服务

由于: 停车优化

生效日期: 2 月 24 日起

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31150
Routes: 52-UC Village - Cedar - UC Campus, 65-Grizzly Peak - Euclid, 67-Spruce - Oxford
Stop Changes on 14th Ave.
Due to: Construction completion (City of Oakland)

Effective: Immediately

Lines Affected: 14 and 96

Please see the AC Transit website for more information: https://www.actransit.org/node/31201
----
Cambios en las paradas en 14th Ave.

Debido a: Finalización de la construcción (City of Oakland)

Efectivo: Inmediatamente

Líneas afectadas: 14 y 96

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31201
----
14th Ave. 沿线车站服务调整

由于: 完成施工 (City of Oakland)

生效日期: 立即生效

受影响线路: 的 14 和 96 号线

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31201
Routes: 14-14th St - San Antonio - High St, 96-Alameda Pt. - 14th Ave. - Dimond
Broadway at 3rd St. Stop Closed
Broadway at 3rd St. Stop Closed

Due to: Event

Effective: 8:00 a.m. – 8:00 p.m. March 14

Please see the AC Transit website for more information: https://www.actransit.org/node/24804
---

Cierre de la parada en Broadway con 3rd St.

Debido a: Evento

Efectivo: 8:00 a.m. – 8:00 p.m. 14 de Marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/24804
---
Broadway 和 3rd St. 交叉口站暂停服务

由于: 事件

生效日期: 3 月 14 日,每天上午 8:00 至下午 8:00

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/24804
Routes: 12-MLK Jr. - Temescal - Grand, 72-CCC - San Pablo, 72L-San Pablo Limited, 72M-Macdonald - San Pablo
Grand St. Stop Closures
Grand St. Stops Closures

Due to: Construction

Effective: 8:00 a.m. – 2:00 p.m. daily, until further notice.

Please see the AC Transit website for more information: https://www.actransit.org/node/25820
---
Cierre de las paradas en Grand St.

Debido a: Trabajos de construcción

Efectivo: 8:00 a.m. – 2:00 p.m. diario, hasta nuevo aviso.

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/25820
---
Grand St. 车站关闭

由于: 施工

生效日期: 直到 另行通知,每天上午 8:00 至下午 2:00

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/25820
Route: 30-Dimond - Fruitvale - South Shore
Otis Dr. Stops Closed
Otis Dr. Stops Closed

Due to: Construction

Effective: 8:00 a.m. – 3:00 p.m. weekdays, immediately until further notice

Please see the AC Transit website for more information: https://www.actransit.org/node/26379
---
Cierre de las paradas en Otis Dr.

Debido a: Trabajos de construcción

Efectivo: 8:00 a.m. – 3:00 p.m. entre semana, Inmediatamente hacia nuevo aviso

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/26379
---
Otis Dr. 交叉口站暂停服务

由于: 施工

生效日期: 即生 直到 另行通知, 工作日上午 7:00 至晚上 8:00.

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/26379
Routes: 31-Skyline Blvd-Fruitvale-Bay Farm, W-Bay Farm - South Shore Transbay
Cedar Ave. Stop Moved
Cedar Blvd. at Moores Ave. Stop Move

Due to: Construction

Effective: January 5, 2026 – January 5, 2027

Please see the AC Transit website for more information: https://www.actransit.org/node/30202
---
Cierre de la parada en Cedar Blvd. con Moores Ave.

Debido a: Trabajos de construcción

Efectivo: 5 de enero de 2026 al 5 de enero de 2027

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/30202
---
Cedar Blvd. 和 Moores Ave. 交叉口站暂停服务

由于: 施工

生效日期: 2026 年 1 月 5 日 – 2027 年 1 月 5 日 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/30202
Routes: 200-Decoto - Newark Blvd. - Mowry, 281-Decoto - Paseo Padre-Cedar Blvd, 620-Newark Middle - Cedar, 627-Newark Memorial-Cedar-Newark Bl.
Oak St. Stops Closed
Due to: Construction (Oakland Alameda Access Project)

Effective: Immediately until further notice

Line affected: 96 to Alameda Point

Please see the AC Transit website for more information: https://www.actransit.org/node/31273
-----
Cierre de las paradas en Oak St.

Debido a: Trabajos de construcción (Oakland Alameda Access Project)

Efectivo: Inmediatamente hasta nuevo aviso

Líneas Afectada: 96 hacia Alameda Point

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31273
----
Oak St. 车站关闭

由于: 施工 (Oakland Alameda Access Project)

开始日期: 即生直到另行通知

受影响线路: 开往 Alameda Point 的96号线

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31273
Route: 96-Alameda Pt. - 14th Ave. - Dimond
Edes Ave & Tyler St Stop Closed
Edes Ave. at Tyler St. Stop Closed

Due to: Construction

Effective: 7:00 a.m. – 5:00 p.m. March 16

Please see the AC Transit website for more information: https://www.actransit.org/node/31306
---

Cierre de la parada en Edes Ave. con Tyler St.

Debido a: Trabajos de construcción

Efectivo: 7:00 a.m. – 5:00 p.m. 16 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/31306

---

Edes Ave. 和 Tyler St. 交叉口站暂停服务

由于:施工

生效时间:3月16日 早上7:00到下午5:00

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/31306
Route: 45-Seminary - Sobrante Park
MLK jr way at 59th Stop Closed
Martin Luther King Jr. Way at 59th St. Stop Closed

Due to: Construction

Effective: 7:00 a.m. – 5:00 p.m. March 16

Please see the AC Transit website for more information: https://www.actransit.org/node/30495
---
Cierre de la parada en Martin Luther King Jr. Way con 59th St.

Debido a: Trabajos de construcción

Efectivo: 7:00 a.m. – 5:00 p.m. 16 de marzo

Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/30495
---
Martin Luther King Jr. Way 和 59th St. 交叉口站暂停服务

由于: 施工

生效日期: 3 月 16 日,上午 7:00 至晚上 5:00 .

更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/30495
Route: 12-MLK Jr. - Temescal - Grand