Current time: Refresh
Agencies » Sound Transit
• 2 Line-Lynnwood - Downtown Redmond
Remove ads by becoming a Premium User
Vehicle 939.759460 0:13 behind going ↓Downtown Redmond
past U District
Vehicle 941.814867 0:26 ahead of going ↓Downtown Redmond
aprchg Shoreline North/185th
Vehicle 946.938659 0:08 behind going ↓Downtown Redmond
aprchg Overlake Village
Vehicle 946.467455 0:01 behind going ↓Downtown Redmond
past Marymoor Village
Vehicle 945.755411 1:35 behind going ↑Lynnwood City Center
aprchg Int'l Dist/Chinatown
Vehicle 945.199228 0:13 behind going ↑Lynnwood City Center
past Capitol Hill
Vehicle 943.135281 0:24 behind going ↑Lynnwood City Center
aprchg Judkins Park
Vehicle 944.733945 0:24 behind going ↑Lynnwood City Center
aprchg Roosevelt
Vehicle 944.219096 1:06 ahead of going ↑Lynnwood City Center
aprchg Shoreline South/148th
Vehicle 944.005478 4:37 behind going ↑Lynnwood City Center
aprchg East Main
Vehicle 944.479294 1:31 behind going ↑Lynnwood City Center
aprchg Wilburton
Vehicle 943.480800 0:12 behind going ↑Lynnwood City Center
aprchg Mountlake Terrace
Vehicle 945.089968 0:32 ahead of going ↑Lynnwood City Center
past Overlake Village
Vehicle 943.227806 0:37 behind going ↑Lynnwood City Center
aprchg Lynnwood City Center Last seen 4:22
Vehicle 945.398405 0:21 ahead of going ↑Lynnwood City Center
past Marymoor Village
The east stairwell in the center of the South Bellevue Station Garage is closed until further notice due to needed maintenance. To exit the garage, please use the stairwells located along the perimeters of the north and south ends.
Affected lines:
2 Line
Signs and barricades will be in place during work hours.
The work schedule is subject to change. For updates, visit www.soundtransit.org/alerts to sign up for alerts and current information on service disruptions.
The last Lynnwood-bound 2 Line train serving all stations will depart from Downtown Redmond Station at 10:30 p.m., reaching Lynnwood City Center Station at 11:48 p.m.
The last Redmond-bound 2 Line train serving all stations will depart Lynnwood City Center at 9:16 p.m., reaching Downtown Redmond Station at 10:33 p.m.
Shuttle buses between South Bellevue Station and Overlake Station will run every 10 - 15 minutes.
Affected stops:
Overlake Village
• To Lynnwood: 152nd Ave NE & Da Vinci Ave NE
• To Downtown Redmond: 152nd Ave NE & NE Shen St
Bel-Red
• To Lynnwood: 132nd Ave NE & NE Spring Blvd
• To Downtown Redmond: 132nd Ave NE & NE Spring Blvd
Spring District
• To Lynnwood: 120th Ave NE & NE Spring Blvd
• To Downtown Redmond: 120th Ave NE & NE Spring Blvd
Wilburton
• To Lynnwood: NE 8th St & 118th Ave NE
• To Downtown Redmond: NE 8th St & NE 116th Ave NE
Bellevue Downtown
• To Lynnwood: 110th Ave NE & NE 6th St
• To Downtown Redmond: 110th Ave NE & NE 6th St
East Main
• To Lynnwood: 112th Ave SE & SE 300 Block
• To Downtown Redmond: 112th Ave & SE 300 Block
South Bellevue
• To Lynnwood: South Bellevue Sta – Bay 1
• To Downtown Redmond: South Bellevue Sta – Bay 3
Sound Transit is upgrading signaling equipment between Spring District and Overlake Village stations to improve system reliability.
2 Line trains will arrive every 20 minutes between Lynnwood City Center and Spring District stations, and every 13 minutes between Overlake Village and Downtown Redmond stations.
At Wilburton and Spring District stations, please board all trains on the platform to Lynnwood. At Overlake Village Station, please board all trains on the platform to Downtown Redmond.
2 Line shuttle buses will arrive about every 10 to 15 minutes.
Below are shuttle bus stops for affected stations:
Spring District
• To Lynnwood: 120th Ave NE & NE Spring Blvd
• To Downtown Redmond: 120th Ave NE & NE Spring Blvd
BelRed
• To Lynnwood: 132nd Ave NE & NE Spring Blvd
• To Downtown Redmond: 132nd Ave NE & NE Spring Blvd
Overlake Village
• To Lynnwood: 152nd Ave NE & Da Vinci Ave NE
• To Downtown Redmond: 152nd Ave NE & NE Shen St