Current time: Refresh
• METRO Blue Line Vehicle Location Map
Remove ads by becoming a Premium User
Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen
Vehicle 31138 5:38 behind going ↑Mpls-Target Field
aprchg Warehouse District Hennepin Ave Station Last seen 1:07
Vehicle 31141 1:35 behind going ↓Mall of America
aprchg 30th Ave Station Last seen 1:07
Vehicle 31142 3:46 behind going ↑Mpls-Target Field
aprchg Franklin Ave Station Last seen 1:03
Vehicle 31145 2:01 behind going ↓Mall of America
aprchg Fort Snelling Station Last seen 1:01
Vehicle 31149 1:29 behind going ↓Mall of America
past Franklin Ave Station
Vehicle 31150 3:46 behind going ↑Mpls-Target Field
aprchg Bloomington Central Station Last seen 1:07
Vehicle 31153 0:54 behind going ↓Mall of America
past Target Field Station Platform 2 Last seen 1:02
Vehicle 31154 4:44 ahead of going ↑Mpls-Target Field
at Mall of America Station Last seen 1:07
Missing vehicles
Scheduled to be at 38th St Station going to ↑Mpls-Target Field.
UPDATE: Starting at 3 a.m. on Saturday, Oct. 17, buses will replace trains on the METRO Blue Line between Airport-Terminal 2 and Mall of America stations to allow for needed maintenance.
Please plan extra time for your trip. Replacement bus timing can vary and trips may take longer.
Train service will resume Monday, Oct. 19.
Visit metrotransit.org/closure for bus boarding locations.
Affected stops:
Mall of America Station (northbound)
30th Ave Station (northbound)
Bloomington Central Station (northbound)
American Blvd Station (northbound)
Terminal 2 Station (southbound)
American Blvd Station (southbound)
Bloomington Central Station (southbound)
30th Ave Station (southbound)
Mall of America Station (southbound)
Starting at 8 p.m. Friday, Oct. 16, METRO Blue Line customers may experience slight delays between Airport-Terminal 2 and Mall of America stations due to single-track service going into effect in that area. Please be aware that customers may need to board the train on the opposite side of station at American Blvd. and Bloomington Central stations.
Replacement bus service will go into effect for these stations (Airport - Terminal 2 through Mall of America) starting at 3 a.m. Saturday, Oct. 17.
Full service resumes Monday, Oct. 19.
Affected stops:
Bloomington Central Station (northbound)
American Blvd Station (northbound)
American Blvd Station (southbound)
Bloomington Central Station (southbound)