Current time: Refresh
Agencies » Boston MBTA
• Framingham/Worcester Line
Remove ads by becoming a Premium User
Affected direction: Outbound
Affected stops:
Readville
All gates at South Station are expected to be in service during the first week in January.
Affected direction: Outbound
Vehicle 1828 1:09:38 behind going 581 ←Worcester
aprchg Ashland
Vehicle 1851 19:14 behind going 585 ←Worcester
aprchg West Natick
Missing vehicles
Scheduled to be at Westborough going to 592 →South Station.
Leaflet | Map data © OpenStreetMap contributors
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.