Current time: Refresh
Agencies » Boston MBTA
• Fairmount Line
Remove ads by becoming a Premium User
• Fairmount Line trains will operate every 60 to 90 minutes after 12 PM on March 26.
• Train 1627 (the 10:17 AM train from South Station to Readville) will terminate at Fairmount.
• Train 1638 (the 11 AM train from Readville to South Station) will originate at Fairmount at 11:03 AM.
• After 12 PM, all trains will originate and terminate at Fairmount and will not service Readville.
Vehicle 1859 1:33 behind going 1662 ↑South Station
past Four Corners/Geneva
Missing vehicles
Scheduled to be at Newmarket going to 1659 ↓Readville.
Leaflet | Map data © OpenStreetMap contributors