Current time: Refresh

Agencies » Boston MBTA

 •  SL1-Logan Airport Terminals - South Station

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 1313 Articulation 3:20 ahead of going South Station
past Terminal B Stop 1 - Arrivals Level

Vehicle 1332 Articulation 2:09 behind going Logan Airport
at Silver Line Way

Vehicle 1333 Articulation 3:15 ahead of going Logan Airport Many Seats Load: 20%
at South Station Last seen 2:37

Vehicle 1338 Articulation 14:27 ahead of going Logan Airport Many Seats Load: 20%
at South Station Last seen 3:49

Vehicle 1342 Articulation 0:16 ahead of going South Station Few Seats Load: 40%
past Terminal E - Arrivals Level

Missing vehicles

Scheduled to be at World Trade Center going to South Station.

Leaflet | Map data © OpenStreetMap contributors

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025