Current time: Refresh

Agencies » Baltimore MTA

 •  Penn - Washington

 
Vehicles
 

Remove ads by becoming a Premium User

Vehicle 000017 9:48 behind going Train 443 Washington
aprchg New Carrollton Marc sb

Vehicle 000010 6:48 behind going Train 445 Washington
aprchg Penn Station Marc sb Last seen 2:06

Vehicle 000023 3:07 behind going Train 440 Baltimore
past Union Station Marc Washington

Vehicle 004910 2:05 behind going Train 438 Baltimore
past Union Station Marc Washington

Vehicle 000028 1:23 behind going Train 536 Perryville
aprchg Bwi Rail Station Marc nb

Vehicle 000084 1:33 behind going Train 634 Baltimore And Martin Air
past Penn Station Marc nb

Vehicle 000032 5:09 behind going Train 532 Baltimore And Perryville
past Edgewood Marc nb

Leaflet | Map data © OpenStreetMap contributors

New MARC Student Saver Program Effective January 21, 2026 Started Wed Jan 21 Until Sun May 31
Students can now save 50% on One-Way and Monthly MARC tickets. This discount applies to high school, vocational, and college/graduate students on all MARC lines.

How to Use -- First, register and verify your enrollment at www.mta.maryland.gov/marc-student-saver . Once approved, you can purchase tickets via the CharmPass App (Discounted fares will be enabled in your mobile account) or Ticket Vending Machines (Use a unique code to purchase paper tickets). Annual registration and valid student ID are required.

Thank you for riding MARC Train.
MARC Penn Line - February 16 schedule change Started Wed Feb 11 Until Fri Mar 13
MARC Penn Line schedules will change on February 16 and March 16, 2026 due to a major Amtrak trackwork project in New Jersey, which is resulting in significant modifications to Amtrak train schedules between Washington and New York. In addition, a project has begun south of Union Station to construct a new railroad bridge across the Potomac River, which is affecting Amtrak trains that travel through Washington, DC to points south. The changes to Amtrak schedules resulting from these two projects will require MARC Train to modify our schedules as follows:

--Until February 13: Current schedule (May 12, 2025) is in effect.

--February 16: Interim schedule takes effect.

--March 13: Interim schedule ends.

--March 16: Most (**but not all**) train schedules revert to the May 12, 2025 schedule, with additional changes due to Amtrak trackwork that will be starting between Penn Station and Edgewood.

Given the short effective dates of the February 16 schedule, full Penn Line timetables will not be produced. Passengers are can download a PDF copy of the new timetable at www.mta.maryland.gov/Penn_FebMar_changes . Limited copies of timetable grids are available at stations. This webpage also contains a full list of the changes. The March 16 schedule change will be announced and distributed by the first week of March.

Thank you for riding MARC Train.