Current time: Refresh
Agencies » Calgary Transit
• 5-North Haven
Remove ads by becoming a Premium User
Vehicle 8314 2:08 ahead of going North Haven
past Kensington RD on SB 10 ST NW
Vehicle 8107 2:03 behind going North Haven
at 2 AV NE on NB Edmonton TR
Vehicle 8261 0:33 ahead of going North Haven
aprchg 57 AV NW on SB North Haven DR
Vehicle 8284 4:05 behind going North Haven
aprchg 64 AV NE on NB 4 ST NE
Leaflet | Map data © OpenStreetMap contributors
Starting Sunday, June 1 through Thursday, December 31, 2026, the right lane of northbound Edmonton Trail N.E. @ 1 Street N.E. will be closed for construction. Route 5 will have stop closures.
Daily closures will occur between 9 a.m. and 3 p.m..
The following stops will be temporarily closed:
- NB Edmonton TR @ 1 AV NE (#5941)
Please use the following stops in lieu of the closed stops:
- NB Edmonton TR @ 1 AV NE (#5941) - 71m north of closed stop