Current time: Refresh
Agencies » Calgary Transit
• 5-North Haven
Remove ads by becoming a Premium User
Vehicle 8273 1:59 ahead of going North Haven
aprchg 9 ST SW on EB 5 AV SW Last seen 1:04
Vehicle 8327 1:26:06 behind going North Haven
at 6 AV NE on NB Edmonton TR
Vehicle 8332 1:30 behind going North Haven
past Ninga RD NW on SB North Haven DR Last seen 1:05
Vehicle 8339 0:49 ahead of going North Haven
aprchg 78th Avenue N Station (SB)
Missing vehicles
Scheduled to be at 14 AV NE on NB Edmonton TR going to North Haven.
Leaflet | Map data © OpenStreetMap contributors
Starting Sunday, June 1 through Thursday, December 31, 2026, the right lane of northbound Edmonton Trail N.E. @ 1 Street N.E. will be closed for construction. Route 5 will have stop closures.
Daily closures will occur between 9 a.m. and 3 p.m..
The following stops will be temporarily closed:
- NB Edmonton TR @ 1 AV NE (#5941)
Please use the following stops in lieu of the closed stops:
- NB Edmonton TR @ 1 AV NE (#5941) - 71m north of closed stop