Current time: Refresh

 •  3-Sandstone/Elbow Dr SW Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 6005 18:29 behind going Elbow Drive
at Heritage LRT Station

Vehicle 6016 1:35 ahead of going Elbow Drive
at 17 AV SW on SB 4 ST SW

Vehicle 6036 1:00 ahead of going Elbow Drive
aprchg Bel-Aire DR SW on SB Elbow DR Last seen 1:21

Vehicle 6057 4:30 ahead of going Elbow Drive
at 2 ST SW on WB 6 AV SW

Vehicle 6065 0:32 behind going Centre St N
at 4 AV S on NB Centre ST S

Vehicle 8031 0:36 behind going Elbow Drive
past 43 AV N on SB Centre ST N

Vehicle 8104 1:50 behind going Centre St N
aprchg 38 AV N on NB Centre ST N

Vehicle 8229 0:20 ahead of going Elbow Drive
aprchg Heritage LRT Station

Vehicle 8357 0:54 ahead of going Elbow Drive
aprchg 5 ST SW on EB 12 AV SW

Vehicle 8519 1:21 ahead of going Elbow Drive
at Sifton BV SW on SB Elbow DR

Missing vehicles

Scheduled to be at Sandstone Terminal on NB going to Centre St N.

Scheduled to be at 19 AV SW on NB 4 ST SW going to Centre St N.

Scheduled to be at 70 AV SW on NB Elbow DR going to Centre St N.

Scheduled to be at Berkley DR NW on EB Beddington BV going to Elbow Drive.

Leaflet | Map data © OpenStreetMap contributors


Starting on Thursday, July 30, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 22, northbound Elbow Drive S.W. will have a left lane closure at Malibou Road S.W. to accommodate concrete work. Routes 3 & 9 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ Malibou RD SW (#8712)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ Malibou RD SW (30m north of the closed stop)
Started Thu Jul 30 Until Sat Aug 22

Starting Friday, August 14 through Friday, August 28, from 9 a.m. to 3 p.m. daily, there will be a right lane closure on southbound 4 Street S.W. @ 20 Avenue S.W. for construction work. Routes 3, 17 and 449 will have a stop closure.


The following stop will be temporarily closed:



  • SB 4 ST S.W. @ 19 AV S.W. (#7306)


Please use the following stop in lieu of the closed stop:



  • SB 4 ST S.W.@ 21 AV S.W. (#5184)

Started Fri Aug 14 Until Fri Aug 28

Starting Friday, August 7, and continuing daily from 9 a.m.- 3 p.m. until Thursday, August 27, there will be a lane closure on northbound Elbow Drive S.W. from 49 - 51 Avenue S.W. Route 3 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ 50 AV SW (#8412)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ 48 AV SW (near side)
Started Fri Aug 7 Until Thu Aug 27

Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31