Current time: Refresh

 •  3-Sandstone/Elbow Dr SW Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 6090 6:06 behind going Centre St N
at 7 AV SW on NB 4 ST SW Last seen 1:04

Vehicle 8219 2:04 behind going Centre St N
at 38 AV N on NB Centre ST N

Vehicle 8229 1:56 behind going Elbow Drive
past 2 ST SW on WB 6 AV SW

Vehicle 8244 0:21 ahead of going Elbow Drive
past Malibou RD SW on SB Elbow DR Last seen 1:02

Vehicle 8333 7:43 behind going Elbow Drive
past 64th Avenue N Station (SB) Last seen 1:10

Vehicle 8430 Waiting 9:15. 9:54 behind going Elbow Drive
past Heritage LRT Station Last seen 1:09

Vehicle 8475 0:08 ahead of going Centre St N
at Sandstone Terminal on NB Last seen 1:11

Missing vehicles

Scheduled to be at 19 AV SW on NB 4 ST SW going to Centre St N.

Leaflet | Map data © OpenStreetMap contributors


Starting on Thursday, July 30, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 22, northbound Elbow Drive S.W. will have a left lane closure at Malibou Road S.W. to accommodate concrete work. Routes 3 & 9 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ Malibou RD SW (#8712)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ Malibou RD SW (30m north of the closed stop)
Started Thu Jul 30 Until Sat Aug 22

Starting Friday, August 14 through Friday, August 28, from 9 a.m. to 3 p.m. daily, there will be a right lane closure on southbound 4 Street S.W. @ 20 Avenue S.W. for construction work. Routes 3, 17 and 449 will have a stop closure.


The following stop will be temporarily closed:



  • SB 4 ST S.W. @ 19 AV S.W. (#7306)


Please use the following stop in lieu of the closed stop:



  • SB 4 ST S.W.@ 21 AV S.W. (#5184)

Started Fri Aug 14 Until Fri Aug 28

Starting Friday, August 7, and continuing daily from 9 a.m.- 3 p.m. until Thursday, August 27, there will be a lane closure on northbound Elbow Drive S.W. from 49 - 51 Avenue S.W. Route 3 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ 50 AV SW (#8412)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ 48 AV SW (near side)
Started Fri Aug 7 Until Thu Aug 27

Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31