Current time: Refresh

 •  3-Sandstone/Elbow Dr SW Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 6003 5:21 ahead of going Elbow Drive
at 2 ST SW on WB 6 AV SW

Vehicle 6012 2:21 ahead of going Centre St N
at Sandstone Terminal on NB

Vehicle 6016 Waiting 14:15. 17:32 behind going Elbow Drive
past Heritage LRT Station

Vehicle 6036 1:03 ahead of going Elbow Drive
aprchg 14 AV SW on SB 4 ST SW

Vehicle 6048 0:53 behind going Elbow Drive
aprchg 54 AV SW on SB Elbow DR

Vehicle 6079 0:15 behind going Centre St N
past 2 ST SW on EB 5 AV SW

Vehicle 6080 11:55 behind going Centre St N
aprchg Sandstone Terminal on NB

Vehicle 7875 3:02 ahead of going Elbow Drive
aprchg 32 AV N on SB Centre ST N

Vehicle 7920 1:22 ahead of going Elbow Drive
at Heritage LRT Station

Vehicle 8177 0:35 ahead of going Centre St N
past 43 AV N on NB Centre ST N

Vehicle 8228 0:22 behind going Elbow Drive
past 29 AV SW on WB Elbow DR

Vehicle 8516 0:05 ahead of going Centre St N
aprchg 21 AV SW on NB 4 ST SW

Vehicle 8593 0:28 ahead of going Elbow Drive
past 7 AVE SW on SB 5 ST SW

Missing vehicles

Scheduled to be at 75 AV SW on NB Elbow DR going to Centre St N.

Scheduled to be at Berkley RD NW on EB Beddington BV going to Elbow Drive.

Leaflet | Map data © OpenStreetMap contributors


Starting on Thursday, July 30, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 22, northbound Elbow Drive S.W. will have a left lane closure at Malibou Road S.W. to accommodate concrete work. Routes 3 & 9 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ Malibou RD SW (#8712)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ Malibou RD SW (30m north of the closed stop)
Started Thu Jul 30 Until Sat Aug 22

Starting Friday, August 14 through Friday, August 28, from 9 a.m. to 3 p.m. daily, there will be a right lane closure on southbound 4 Street S.W. @ 20 Avenue S.W. for construction work. Routes 3, 17 and 449 will have a stop closure.


The following stop will be temporarily closed:



  • SB 4 ST S.W. @ 19 AV S.W. (#7306)


Please use the following stop in lieu of the closed stop:



  • SB 4 ST S.W.@ 21 AV S.W. (#5184)

Started Fri Aug 14 Until Fri Aug 28

Starting Friday, August 7, and continuing daily from 9 a.m.- 3 p.m. until Thursday, August 27, there will be a lane closure on northbound Elbow Drive S.W. from 49 - 51 Avenue S.W. Route 3 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ 50 AV SW (#8412)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ 48 AV SW (near side)
Started Fri Aug 7 Until Thu Aug 27

Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31