Current time: Refresh
• 3-Sandstone/Elbow Dr SW Vehicle Location Map
Remove ads by becoming a Premium User
Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen
Vehicle 6003 5:21 ahead of going ↓Elbow Drive
at 2 ST SW on WB 6 AV SW
Vehicle 6012 2:21 ahead of going ↑Centre St N
at Sandstone Terminal on NB
Vehicle 6016 Waiting 14:15. 17:32 behind going ↓Elbow Drive
past Heritage LRT Station
Vehicle 6036 1:03 ahead of going ↓Elbow Drive
aprchg 14 AV SW on SB 4 ST SW
Vehicle 6048 0:53 behind going ↓Elbow Drive
aprchg 54 AV SW on SB Elbow DR
Vehicle 6079 0:15 behind going ↑Centre St N
past 2 ST SW on EB 5 AV SW
Vehicle 6080 11:55 behind going ↑Centre St N
aprchg Sandstone Terminal on NB
Vehicle 7875 3:02 ahead of going ↓Elbow Drive
aprchg 32 AV N on SB Centre ST N
Vehicle 7920 1:22 ahead of going ↓Elbow Drive
at Heritage LRT Station
Vehicle 8177 0:35 ahead of going ↑Centre St N
past 43 AV N on NB Centre ST N
Vehicle 8228 0:22 behind going ↓Elbow Drive
past 29 AV SW on WB Elbow DR
Vehicle 8516 0:05 ahead of going ↑Centre St N
aprchg 21 AV SW on NB 4 ST SW
Vehicle 8593 0:28 ahead of going ↓Elbow Drive
past 7 AVE SW on SB 5 ST SW
Missing vehicles
Scheduled to be at 75 AV SW on NB Elbow DR going to ↑Centre St N.
Scheduled to be at Berkley RD NW on EB Beddington BV going to ↓Elbow Drive.
Starting on Thursday, July 30, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 22, northbound Elbow Drive S.W. will have a left lane closure at Malibou Road S.W. to accommodate concrete work. Routes 3 & 9 will have a stop closure.
The following stop will be temporarily closed:
- NB Elbow DR @ Malibou RD SW (#8712)
Please use the following stop in lieu of the closed stop:
- NB Elbow DR @ Malibou RD SW (30m north of the closed stop)
Starting Friday, August 14 through Friday, August 28, from 9 a.m. to 3 p.m. daily, there will be a right lane closure on southbound 4 Street S.W. @ 20 Avenue S.W. for construction work. Routes 3, 17 and 449 will have a stop closure.
The following stop will be temporarily closed:
- SB 4 ST S.W. @ 19 AV S.W. (#7306)
Please use the following stop in lieu of the closed stop:
- SB 4 ST S.W.@ 21 AV S.W. (#5184)
Starting Friday, August 7, and continuing daily from 9 a.m.- 3 p.m. until Thursday, August 27, there will be a lane closure on northbound Elbow Drive S.W. from 49 - 51 Avenue S.W. Route 3 will have a stop closure.
The following stop will be temporarily closed:
- NB Elbow DR @ 50 AV SW (#8412)
Please use the following stop in lieu of the closed stop:
- NB Elbow DR @ 48 AV SW (near side)
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ E. of 1 ST SW (#6334)
Please use one of the following stops in lieu of the closed stop:
- Route 1:
- WB 6 AV SW @ 2 ST SW (#5178)
- WB 6 AV SE @ 1 ST SE (#2234)
- WB 6 AV SW @ 2 ST SW (#5178)
- Route 3:
- WB 6 AV SW @ 2 ST SW (#5178)
- SB Centre ST S @ 4 AV S (#6669)
- WB 6 AV SW @ 2 ST SW (#5178)
- Route 17:
- SB Centre ST S @ 4 AV S (#6669)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
- SB Centre ST S @ 4 AV S (#6669)
- Route 101:
- WB 6 AV SE @ 1 ST SE (#7466)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
- WB 6 AV SE @ 1 ST SE (#7466)