Current time: Refresh

 •  3-Sandstone/Elbow Dr SW Vehicle Location Map

 
Vehicles
 

Remove ads by becoming a Premium User

Sort by Fleet Number | Sort by Schedule Adherance | Sort by Southwest to Northeast | Sort by Last Seen

Vehicle 8437 0:38 behind going Elbow Drive
past 2 ST SW on WB 6 AV SW

Vehicle 8454 7:09 behind going Centre St N
aprchg 8 AV N on NB Centre ST N

Vehicle 8507 2:50 behind going Centre St N
at Sandstone Terminal on NB

Vehicle 8508 0:42 ahead of going Centre St N
past 11 AV SW on NB 4 ST SW

Vehicle 8555 0:36 behind going Centre St N
past 5 ST SW on WB Heritage DR

Vehicle 8650 4:10 ahead of going Elbow Drive
at 28th Avenue N Station (SB)

Missing vehicles

Scheduled to be at Glenmore TR SW on SB Elbow DR going to Elbow Drive.

Leaflet | Map data © OpenStreetMap contributors


Starting at 9 a.m. on Tuesday, July 28, and continuing until 6 p.m. on Friday, August 14, eastbound Beddington Boulevard N.W. will have closures between Bermuda Drive N.W. & Centre Street N. Routes 3, 46 & 64 will have stop closures.

The following stops will be temporarily closed:


  • SB Beddington BV @ Berwick DR NW (#5162)
  • EB Beddington BV @ Berwick WY NW (#5163)
  • EB Beddington BV @ Berkley RD NW (#8622)
  • EB Beddington BV @ Berkley DR NW (#6331)
  • WB Beddington BV @ Centre ST N (#8634)

Please use the following temporary stops in lieu of the closed stops:


  • SB Beddington BV @ Berwick DR NW (25m south of the closed stop)
  • EB Beddington BV @ Berwick WY NW (25m east of the closed stop)
  • EB Beddington BV @ Berkley RD NW (25m east of the closed stop)
  • EB Beddington BV @ Berkley DR NW (25m east of the closed stop)
  • WB Beddington BV @ Centre ST N (75m west of the closed stop, far side driveway access)
Started Mon Jul 27 Until Fri Aug 14

Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31

Starting Friday, August 7, and continuing daily from 9 a.m.- 3 p.m. until Thursday, August 27, there will be a lane closure on northbound Elbow Drive S.W. from 49 - 51 Avenue S.W. Route 3 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ 50 AV SW (#8412)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ 48 AV SW (near side)
Started Fri Aug 7 Until Thu Aug 27

Starting on Thursday, July 30, and continuing daily from 9 a.m. - 3 p.m. until Saturday, August 22, northbound Elbow Drive S.W. will have a left lane closure at Malibou Road S.W. to accommodate concrete work. Routes 3 & 9 will have a stop closure.

The following stop will be temporarily closed:


  • NB Elbow DR @ Malibou RD SW (#8712)

Please use the following stop in lieu of the closed stop:


  • NB Elbow DR @ Malibou RD SW (30m north of the closed stop)
Started Thu Jul 30 Until Sat Aug 22