Current time: Refresh
Agencies » Calgary Transit
• 23-52 St E
Remove ads by becoming a Premium User
Vehicle 8364 1:23 ahead of going ↑52 St E
aprchg Mahogany DR SE on NB 52 ST
Vehicle 8470 0:29 behind going ↑52 St E
past McKenzie Terminal on NB 52 ST SE
Vehicle 8197 1:35 ahead of going ↑52 St E
past 48 AV SE on NB 52 ST SE
Vehicle 6014 12:15 behind going ↑52 St E
aprchg 14 AV SE on NB 52 ST SE
Vehicle 8539 1:41 behind going ↓52 St E
past Auburn Bay DR SE on SB 52 ST
Vehicle 8438 1:21 ahead of going ↓52 St E
at Mckenzie Towne Li SE on SB 52 St
Vehicle 8279 0:44 behind going ↓52 St E
past 110 AV SE on SB 52 ST SE
Vehicle 8586 1:12 ahead of going ↓52 St E
past 76 AV SE on SB 52 ST SE
Vehicle 6061 0:07 ahead of going ↓52 St E
aprchg Erin Woods DR (N. Leg) SE on SB 52 ST SE
Vehicle 6013 2:58 ahead of going ↓52 St E
aprchg Whitehorn Drive Station (SB)
Missing vehicles
Scheduled to be at Martinwood RD NE on NB Falconridge BV going to ↑52 St E.
Scheduled to be at 5 AV SE on NB 52 ST SE going to ↑52 St E.
Scheduled to be at 90 AV SE on NB 52 ST SE going to ↑52 St E.
Scheduled to be at Marbank DR on SB 52 ST NE going to ↓52 St E.
Scheduled to be at Martinwood RD NE on SB Falconbridge BV going to ↓52 St E.
Starting Monday, July 28 at 9 a.m. through Thursday, August 7 at 3 p.m., the right lane of northbound 52 Street SE @ Dufferin Place SE will be closed for construction. Route 23 will have a stop closure.
The following stop will be temporarily closed:
- NB 52 ST SE @ Dufferin PL SE (#3643) - Route 23
Please use the following stop in lieu of the closed stop:
- 50m north of the closed stop.