Current time: Refresh
Agencies » Manchester Bee Network
• 36-Manchester - Salford Shopping Centre - Bolton
Remove ads by becoming a Premium User
Vehicle 2005 0:25 behind going ←Bolton Interchange
aprchg Ashawe Terrace on Kenyon Way
Vehicle 2025 9:19 behind going ←Bolton Interchange
past Manchester Road West on Kenyon Way
Vehicle 2010 0:53 ahead of going ←Bolton Interchange
past Christ the King Church on Manchester Road
Vehicle 3442 8:19 behind going ←Bolton Interchange
at Minerva Road on Bradford Road
Vehicle 2018 Waiting 7:15. 0:30 ahead of going ←Bolton Interchange
at Bolton Interchange Last seen 7:15
Vehicle 2049 0:15 ahead of going ←Bolton Interchange
aprchg Hospital Road on Manchester Road
Vehicle 2021 0:50 ahead of going ←Bolton Interchange
aprchg Salford Shopping Centre on Hankinson Way
Vehicle 2031 0:20 behind going ←Bolton Interchange
at Manchester Crown Court on Bridge Street
Vehicle 2038 1:47 behind going →Piccadilly Gardens
past Coniston Avenue on Cleggs Lane Last seen 2:27
Vehicle 2045 0:13 ahead of going →Piccadilly Gardens
past Walkden Town Centre on High Street
Vehicle 2107 2:49 behind going →Piccadilly Gardens
aprchg Lobelia Avenue on Lavender Road
Vehicle 2112 7:51 behind going →Piccadilly Gardens
past Moss Lane on Manchester Road
Vehicle 2117 3:20 behind going →Piccadilly Gardens
aprchg Doveleys Road on Bolton Road
Vehicle 2004 3:07 ahead of going →Piccadilly Gardens
past Salford Cathedral on Chapel Street
Vehicle 2106 7:29 behind going →Piccadilly Gardens
aprchg Salford Central Rail Station on New Bailey Street
Vehicle 2024 Waiting 1:16:45. 0:25 behind going →Piccadilly Gardens
aprchg Piccadilly Gardens on Parker Street Last seen 1:16:45
Missing vehicles
Scheduled to be at Bolton Rail Station on Newport Street going to →Piccadilly Gardens.
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride, whilst works take place.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.
The bus stops on Princess Street, at the Art Gallery and Arora are closed due to works taking place.